Quick answers
What is Shri Patel Prakash Shankarbhai?
Shri Patel Prakash Shankarbhai is a proposed mining project in Vavdi, Dhrangadhra, Surendranagar, Gujarat. The site covers 9.8 acres.
Who is building it?
The applicant is Patel Prakash Shankarbhai.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Vavdi, Dhrangadhra, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹4.3 crore and a site of 9.8 acres.
When was it filed?
The application was filed on 14 Nov 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 14 Nov 2026 |
| Application filed | 14 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Patel Prakash Shankarbhai |
| Land area | 9.8 acres (4 ha) |
| Project cost | ₹4.3 crore |
| Village / locality | Vavdi |
| Taluk / tehsil | Dhrangadhra |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-15135 |
In context
271 applications in Surendranagar since January 2022 are in the same category (Mining): 107 approved, 59 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 9.8 acres, this one is larger than 83% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Vavdi, Dhrangadhra, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Devlopment of "Kabir Aashram" by Kabir Charitable Trust, Ishadra Ta.… — lapsed, 4 km away
- Vavdi-Virendragadh-Khakharechi Length 18343 Meter 0.83 ha. — more information requested, 4.1 km away
- Mansukhbhai Chikanbhai Kaladia — lapsed, 4.6 km away
- Shri Mansukhbhai Chikanbhai Kaladiya,Survey No.- 503 Paiki — lapsed, 4.6 km away
- Proposed Resin Manufacturing Plant Within the Existing Laminate Manufacturing… — environmental approval granted, 7.2 km away
- Proposed Resin Manufacturing Plant Within the Existing Laminate Manufacturing… — cleared for impact study, 7.2 km away
- Proposed Resin Manufacturing Plant Within the Existing Laminate Manufacturing… — withdrawn, 7.2 km away
- Proposed Resin Manufacturing Plant Within the Existing Laminate Manufacturing… — cleared for impact study, 7.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.