Quick answers
What is this project?
This proposed industrial project by Esterbond Speciality Polymers Private LImited is in Balda, Pardi, Valsad, Gujarat. The site covers 0.9 acres.
Who is building it?
The applicant is Esterbond Speciality Polymers Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Balda, Pardi, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹6.3 crore and a site of 0.9 acres.
When was it filed?
The application was filed on 14 Nov 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 14 Nov 2026 |
| Application filed | 14 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Esterbond Speciality Polymers Private Limited |
| Land area | 3,500 m² |
| Project cost | ₹6.3 crore |
| Village / locality | Balda |
| Taluk / tehsil | Pardi |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-15139 |
In context
283 applications in Valsad since January 2022 are in the same category (Industry): 174 approved, 79 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.9 acres, this one is smaller than 70% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Balda, Pardi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gas Distribution Network in Pardi Taluka of Valsad Ga (Kumbhariya Village… — forest land use approved, 2.1 km away
- Pardi underground Drainage Line Phase-II (UGD) project — more information requested, 3.1 km away
- Gas Distribution Network in Valsad Taluka & Surrounding Area (Dadri Faliya,… — forest land use approved, 3.5 km away
- Crz Clearance for New Proposed Pipeline for Disposal of Treated Wastewater… — coastal clearance granted, 3.8 km away
- Project by Atul Limited — initial checks, 3.8 km away
- 125 mm PE Gas pipeline connectivity from CNG Station Parnera to Potential… — forest land use approved, 4.3 km away
- 4" Steel Pipeline and 125/90mm Dia PE at Pariya Road, Velaparva Road to… — lapsed, 4.8 km away
- 4" Steel Pipeline and 125/90 mm Dia PE at Pariya Road, Velaparva Road to… — forest land use approved, 4.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.