Crz Clearance for New Proposed Pipeline for Disposal of Treated Wastewater Into the Estuary Zone of River Par From Central Etp of Atul Limited at Atul, District Valsad, Gujarat is an approved pipeline project in Hariay, Valsad, Gujarat. The site covers 290.4 acres.
Who is building it?
The applicant is Atul Limited.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 8 Jan 2024), as of 27 Nov 2026.
Where is it?
In Hariay, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹10 crore and a site of 290.4 acres.
When was it filed?
The application was filed on 25 Oct 2023.
Project details
| Status | Coastal clearance granted |
|---|---|
| Status since | 8 Jan 2024 |
| Application filed | 25 Oct 2023 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Atul Limited |
| Land area | 290.4 acres (117.5 ha) |
| Project cost | ₹10 crore |
| Village / locality | Hariay |
| Taluk / tehsil | Valsad |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14923 |
In context
35 applications in Valsad since January 2022 are in the same category (Pipelines): 22 approved, 4 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 290.4 acres, this one is larger than 96% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hariay, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project by Atul Limited — initial checks, 50 m away
- Gas Distribution Network in Valsad Taluka & Surrounding Area (Dadri Faliya,… — forest land use approved, 2.6 km away
- 125 mm PE Gas pipeline connectivity from CNG Station Parnera to Potential… — forest land use approved, 2.8 km away
- Forest land proposal for Diversion for Social Forest Land proposal for forest… — forest land use approved, 2.8 km away
- Forest land proposal for Diversion for Social Forest Land proposal for forest… — lapsed, 2.8 km away
- Pardi underground Drainage Line Phase-II (UGD) project — more information requested, 3.3 km away
- Industrial project by Esterbond Speciality Polymers Private LImited — under environmental review, 3.8 km away
- Residential Cum Commercial Project – "marina Bay" at Block/Survey No.: 1193… — returned to applicant, 4.2 km away
More from Atul Limited in Valsad
- Project by Atul Limited — initial checks
All 6 Atul projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.