What is Developing? Open the mapMap

Initial checksBuildings & townships · Ahmadabad, Gujarat

K.P.Epitome

K.P.Epitome is a proposed building project in Makarba, Sabarmati, Ahmadabad, Gujarat. The site covers 3.5 acres. Its stated project cost is ₹170 crore. As of 27 Nov 2026, its status is “Initial checks” (since 17 Nov 2026).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusInitial checks
Status since17 Nov 2026
Application filed17 Nov 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorBuildings & townships
ApplicantKish Developers
Land area3.5 acres (1.4 ha)
Project cost₹170 crore
Village / localityMakarba
Taluk / tehsilSabarmati
DistrictAhmadabad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-15149

What the filings say

What is planned

Kish Developers proposes an expansion of the K.P.Epitome project, a commercial development in Makarba, Ahmadabad. The project is planned on a land area of 1.42 hectares (3.51 acres) with a total project cost of ₹170 crore. The development consists of multiple blocks providing commercial spaces and mercantile units.

According to the layout plans, the project includes several distinct building blocks:

The tallest structure, Block B, reaches a proposed height of 68.95 metres from ground level. The total built-up area for the project is approximately 83,812.21 square metres, with a total utilized Floor Space Index (FSI) area of 38,376 square metres.

Layout and design

The site layout features a 9.0-metre wide internal approach road and an 8.0-metre wide fire tender route to ensure emergency access. The project incorporates a common plot area of 1,681.77 square metres. The design includes specific provisions for a fire control command room and an electrical sub-station.

Parking is distributed across the basement levels of the major blocks. Block A is served by four lifts with a 12-person capacity each, while Block B is served by multiple lifts, including designated fire lifts. The external facade is designed to have a maximum of 50% glazed surface area using non-reflective glass.

Water, power and access

The applicant's water balance report estimates a total water requirement of 193.26 kilolitres per day (KLD) during the operation phase. Of this, 81.7 KLD will be fresh water, while 111.56 KLD will be met through treated wastewater.

Wastewater generation is estimated at 148.56 KLD, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 175 KLD. The treated water will be reused for flushing (97.5 KLD) and horticulture (7.56 KLD), with the balance disposed of into the municipal sewer line. For the construction phase, the water requirement is estimated at 14.5 KLD.

Stormwater management includes a network of piped drains leading to four percolation wells for groundwater recharge. The annual recharge potential is estimated at approximately 6,000 cubic metres.

Environmental safeguards

The Environmental Management Plan (EMP) allocates a capital budget of ₹105.5 lakh for environmental protection. Key measures include:

Land and surroundings

Geotechnical investigations involved two test bores drilled to a depth of 50 metres. The subsoil profile consists of layers of filled-up soil, stiff clayey silt, and dense silty sand with kankar. The groundwater table was encountered at 30.50 metres below ground level. The site is located in Seismic Zone III. The project boundary is adjacent to a railway line, and a 30-metre building control line has been observed in the layout planning.

K.P.Epitome site plan and layout

4 drawings from the project's filings. Sign in free to see them.

K.P.Epitome: Master layout plan: building blocks, internal roads, and fire tender routes (preview)🔒 Sign in free to see it
Master layout plan: building blocks, internal roads, and fire tender routes
K.P.Epitome: Borehole location plan for geotechnical investigation (preview)🔒 Sign in free to see it
Borehole location plan for geotechnical investigation
K.P.Epitome: Subsoil profile showing geological strata across the site (preview)🔒 Sign in free to see it
Subsoil profile showing geological strata across the site
K.P.Epitome: Rainwater harvesting scheme and desilting chamber details (preview)🔒 Sign in free to see it
Rainwater harvesting scheme and desilting chamber details

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.5 acres, this one is larger than 81% of them.

184 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Makarba, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.