Project details
| Status | Initial checks |
|---|---|
| Status since | 17 Nov 2026 |
| Application filed | 17 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Kish Developers |
| Land area | 3.5 acres (1.4 ha) |
| Project cost | ₹170 crore |
| Village / locality | Makarba |
| Taluk / tehsil | Sabarmati |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-15149 |
What the filings say
What is planned
Kish Developers proposes an expansion of the K.P.Epitome project, a commercial development in Makarba, Ahmadabad. The project is planned on a land area of 1.42 hectares (3.51 acres) with a total project cost of ₹170 crore. The development consists of multiple blocks providing commercial spaces and mercantile units.
According to the layout plans, the project includes several distinct building blocks:
- Block A: A commercial building with 14 floors above ground, plus a stair cabin and machine room level. It includes two basement levels for parking.
- Block B: A commercial building with 17 floors above ground, plus a stair cabin and machine room level. It includes four basement levels for parking.
- Blocks C through K: These appear to be smaller existing or approved units, typically rising to 4 floors.
The tallest structure, Block B, reaches a proposed height of 68.95 metres from ground level. The total built-up area for the project is approximately 83,812.21 square metres, with a total utilized Floor Space Index (FSI) area of 38,376 square metres.
Layout and design
The site layout features a 9.0-metre wide internal approach road and an 8.0-metre wide fire tender route to ensure emergency access. The project incorporates a common plot area of 1,681.77 square metres. The design includes specific provisions for a fire control command room and an electrical sub-station.
Parking is distributed across the basement levels of the major blocks. Block A is served by four lifts with a 12-person capacity each, while Block B is served by multiple lifts, including designated fire lifts. The external facade is designed to have a maximum of 50% glazed surface area using non-reflective glass.
Water, power and access
The applicant's water balance report estimates a total water requirement of 193.26 kilolitres per day (KLD) during the operation phase. Of this, 81.7 KLD will be fresh water, while 111.56 KLD will be met through treated wastewater.
Wastewater generation is estimated at 148.56 KLD, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 175 KLD. The treated water will be reused for flushing (97.5 KLD) and horticulture (7.56 KLD), with the balance disposed of into the municipal sewer line. For the construction phase, the water requirement is estimated at 14.5 KLD.
Stormwater management includes a network of piped drains leading to four percolation wells for groundwater recharge. The annual recharge potential is estimated at approximately 6,000 cubic metres.
Environmental safeguards
The Environmental Management Plan (EMP) allocates a capital budget of ₹105.5 lakh for environmental protection. Key measures include:
- Air Quality: Regular water sprinkling for dust suppression during construction and monitoring of ambient air quality during operations.
- Noise Control: Provision of ear mufflers for workers and use of low-noise construction machinery.
- Solid Waste: Segregation of waste into organic and inorganic components. Biodegradable waste will be converted into compost, while recyclables will be sold to authorized buyers.
- Greenbelt: A two-phase plantation strategy is proposed, starting with evergreen trees at 3.0-metre intervals along the periphery, followed by a second row of trees with larger canopies after 18 months.
Land and surroundings
Geotechnical investigations involved two test bores drilled to a depth of 50 metres. The subsoil profile consists of layers of filled-up soil, stiff clayey silt, and dense silty sand with kankar. The groundwater table was encountered at 30.50 metres below ground level. The site is located in Seismic Zone III. The project boundary is adjacent to a railway line, and a 30-metre building control line has been observed in the layout planning.
K.P.Epitome site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.5 acres, this one is larger than 81% of them.
184 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Makarba, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Titanium Neo — initial checks, 250 m away
- Solitaire Icon — more information requested, 400 m away
- A. Shridhar Olympus — environmental approval granted, 400 m away
- Swati Signia — environmental approval granted, 550 m away
- Environment Clearance for Redevelopment of Existing Building, Namely 'Bhaskar… — under environmental review, 600 m away
- "HR Eliseo-IV" - Residential Apartment with Shops to be developed by "HR… — environmental approval granted, 1.1 km away
- Palm Jumeirah — environmental approval granted, 1.1 km away
- Al Noor — environmental approval granted, 1.2 km away