Quick answers
What is "Sand, Stone and Bajri Mining Project"?
"Sand, Stone and Bajri Mining Project" is an approved mining project in Majra (276), Krishangarh, Solan, Himachal Pradesh. The site covers 4.3 acres.
Who is building it?
The applicant is Gagandeep Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Jun 2023), as of 27 Nov 2026.
Where is it?
In Majra (276), Krishangarh, Solan, Himachal Pradesh.
How big is it?
It has a stated cost of ₹50 lakh and a site of 4.3 acres.
When was it filed?
The application was filed on 27 Jun 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Jun 2023 |
| Application filed | 27 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Gagandeep Singh |
| Land area | 4.3 acres (1.7 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Majra (276) |
| Taluk / tehsil | Krishangarh |
| District | Solan |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00121 |
In context
70 applications in Solan since January 2022 are in the same category (Mining): 54 approved, 7 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.3 acres, this one is larger than 50% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Majra (276), Krishangarh, Solan, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Transfer of EC" for Extraction of Sand, Stone and Bajri from Kh. Nos. 1668/1,… — environmental approval granted, 2 km away
- Sh. Jatinder Singh, Prop: M/s Singh Stone Crusher — environmental approval granted, 2 km away
- Proposed Real Estate Project for Plotted Development namely Crown Residences… — lapsed, 2.2 km away
- Extension in the validity of Environmental Clearance of Construction Project… — environmental approval granted, 2.6 km away
- Proposed Real Estate Housing Colony of M/s Aashirvad Developers and Promoters… — initial checks, 2.7 km away
- 20% Expansion of existing steel manufacturing unit by M/s Kundlas Loh Udyog — lapsed, 3.7 km away
- Capacity Enhancement of existing steel manufacturing plant with increase in… — returned to applicant, 4.2 km away
- Capacity Enhancement of existing steel manufacturing plant with increase in… — cleared for impact study, 4.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.