Expansion in Clinker Production from 2.97 Million TPA (9000 TPD) to 3.5 Million TPA (11000 TPD) by process optimization/debottlenecking under provision of NIPL as per the EIA Notification S.O.1533 (E), dated 14th September, 2006 further amended vide S.O. 980 (E) dated 2nd March, 2021 by M/s UltraTech Cement Limited (Unit-Baga Cement Works)

Expansion in Clinker Production from 2.97 Million TPA (9000 TPD) to 3.5 Million TPA (11000 TPD) by process optimization/debottlenecking under provision of NIPL as per the EIA Notification S.O.1533 (E), dated 14th September, 2006 further amended vide S.O. 980 (E) dated 2nd March, 2021 by M/s UltraTech Cement Limited (Unit-Baga Cement Works) is a proposed industrial building project in Baga (511), Darlaghat, Solan, Himachal Pradesh. The site covers 410.4 acres. Its stated project cost is ₹2,160.9 crore. As of 27 Nov 2026, its status is “Initial checks” (since 12 Dec 2023).

See it on the live map All projects in Solan

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion in Clinker Production from 2.97 Million TPA (9000 TPD) to 3.5 Million TPA (11000 TPD) by process optimization/debottlenecking under provision of NIPL as per the EIA Notification S.O.1533 (E), dated 14th September, 2006 further amended vide S.O. 980 (E) dated 2nd March, 2021 by M/s UltraTech Cement Limited (Unit-Baga Cement Works) is a proposed industrial building project in Baga (511), Darlaghat, Solan, Himachal Pradesh. The site covers 410.4 acres.

Who is building it?

The applicant is M/s. UltraTech Cement Ltd..

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Baga (511), Darlaghat, Solan, Himachal Pradesh.

How big is it?

It has a stated cost of ₹2,160.9 crore and a site of 410.4 acres.

When was it filed?

The application was filed on 12 Dec 2023.

Project details

Official titleExpansion in Clinker Production from 2.97 Million TPA (9000 TPD) to 3.5 Million TPA (11000 TPD) by process optimization/debottlenecking under provision of NIPL as per the EIA Notification S.O.1533 (E), dated 14th September, 2006 further amended vide S.O. 980 (E) dated 2nd March, 2021 by M/s UltraTech Cement Limited (Unit-Baga Cement Works) At Village: Baga, Tehsil: Arki, District: Solan (Himachal Pradesh)
StatusInitial checks
Status since12 Dec 2023
Application filed12 Dec 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantM/s. UltraTech Cement Ltd.
UseIndustrial
Land area410.4 acres (166.1 ha)
Plot area16,60,972 m² (1,78,78,537 sq ft)
Project cost₹2,160.9 crore
Village / localityBaga (511)
Taluk / tehsilDarlaghat
DistrictSolan
StateHimachal Pradesh
Location fromSite boundary on record
Our referenceWID-HP-00140

In context

48 applications in Solan since January 2022 are in the same category (Buildings & townships): 12 approved, 7 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 410.4 acres, this one is larger than 98% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Baga (511), Darlaghat, Solan, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from M/s. UltraTech Cement Ltd. in Solan

All 182 UltraTech Cement projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.