Quick answers
What is this project?
Expansion in Cement production capacity of Existing Stand-alone Grinding Unit from 1.75 Million TPA to 2.0 Million TPA by process optimization under provision of NIPL as per the EIA Notification S.O.1533 (E), dated 14th September, 2006 further amended vide S.O. 980 (E) dated 2nd March, 2021 is a proposed industrial building project in Tikri (17), Nalagarh, Solan, Himachal Pradesh. The site covers 60.6 acres.
Who is building it?
The applicant is M/s. UltraTech Cement Ltd..
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Tikri (17), Nalagarh, Solan, Himachal Pradesh.
How big is it?
It has a stated cost of ₹437.5 crore and a site of 60.6 acres.
When was it filed?
The application was filed on 1 Feb 2024.
Project details
| Official title | Expansion in Cement production capacity of Existing Stand-alone Grinding Unit from 1.75 Million TPA to 2.0 Million TPA by process optimization under provision of NIPL as per the EIA Notification S.O.1533 (E), dated 14th September, 2006 further amended vide S.O. 980 (E) dated 2nd March, 2021 at Village -Pandiyana (Tikri) near Bagheri, Post - Khilian, Tehsil - Nalagarh, District Solan (Himachal Pradesh) by M/s. UltraTech Cement Limited (Unit: Bagheri Cement Works). |
|---|---|
| Status | Initial checks |
| Status since | 1 Feb 2024 |
| Application filed | 1 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | M/s. UltraTech Cement Ltd. |
| Use | Industrial |
| Land area | 60.6 acres (24.5 ha) |
| Plot area | 2,45,100 m² (26,38,232 sq ft) |
| Project cost | ₹437.5 crore |
| Village / locality | Tikri (17) |
| Taluk / tehsil | Nalagarh |
| District | Solan |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00176 |
In context
48 applications in Solan since January 2022 are in the same category (Buildings & townships): 12 approved, 7 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 60.6 acres, this one is larger than 90% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tikri (17), Nalagarh, Solan, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- C/O Link Road from Gara Mora to Moru via Gara Km 0/00 to 5/00 under HPPWD… — lapsed, 1.9 km away
- C/O Link Road from H.B. Jhirian Katali Lakhala to Sidh Baba Balak Nath Temple… — lapsed, 1.9 km away
- Mining of Sand, Stone & Bajri from Luhand Khad Proposed by Sh. Amarjit Singh… — more information requested, 3 km away
- Mining of Sand, Stone & Bajri from Luhand Khad Proposed by Sh. Amarjit Singh… — cleared for impact study, 3 km away
- Terrace Deposits Mining for extraction of Sand, Stone and Bajri proposed by… — environmental approval granted, 4.1 km away
- Two Lane Single Tube Tunnel (Tunnel-3 from Km 23+400 to Km 24+425) in Kiratpur… — more information requested, 4.2 km away
- Hill Slope Mining for Extraction of Sand, Stone and Bajri proposed by Sh.… — environmental approval granted, 4.8 km away
- Extraction of Minor Minerals Stone at Khasra no. 79/2 & 80, Measuring 12-18… — environmental approval granted, 4.8 km away
More from M/s. UltraTech Cement Ltd. in Solan
All 182 UltraTech Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.