Cleared for impact studyMining · Bilaspur, Himachal Pradesh

Extraction of Sand, Stone, & Bajri from Khasra nos. 32 Measuring an area 3.05 Hectare (Private land, Hill slope) falling in Mauza/Mohal Talwara, Tehsil Ghumarwin, District Bilaspur, Himachal Pradesh by Sh. Suresh Kumar, Village Kuthera, Tehsil Ghumarwin & District Bilaspur, H.P.

Extraction of Sand, Stone, & Bajri from Khasra nos. 32 Measuring an area 3.05 Hectare (Private land, Hill slope) falling in Mauza/Mohal Talwara, Tehsil Ghumarwin, District Bilaspur, Himachal Pradesh by Sh. Suresh Kumar, Village Kuthera, Tehsil Ghumarwin & District Bilaspur, H.P is a proposed mining project in Gatwar (295), Bharari, Bilaspur, Himachal Pradesh. The site covers 7.5 acres. Its stated project cost is ₹10 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 26 Apr 2025).

See it on the live map All projects in Bilaspur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Extraction of Sand, Stone, & Bajri from Khasra nos. 32 Measuring an area 3.05 Hectare (Private land, Hill slope) falling in Mauza/Mohal Talwara, Tehsil Ghumarwin, District Bilaspur, Himachal Pradesh by Sh. Suresh Kumar, Village Kuthera, Tehsil Ghumarwin & District Bilaspur, H.P is a proposed mining project in Gatwar (295), Bharari, Bilaspur, Himachal Pradesh. The site covers 7.5 acres.

Who is building it?

The applicant is Suresh Kumar.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 26 Apr 2025), as of 27 Nov 2026.

Where is it?

In Gatwar (295), Bharari, Bilaspur, Himachal Pradesh.

How big is it?

It has a stated cost of ₹10 lakh and a site of 7.5 acres.

When was it filed?

The application was filed on 16 Dec 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Extraction of Sand, Stone, & Bajri from Khasra nos. 32 Measuring an area 3.05 Hectare…

Project details

StatusCleared for impact study
Status since26 Apr 2025
Application filed16 Dec 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantSuresh Kumar
Land area7.5 acres (3.1 ha)
Project cost₹10 lakh
Village / localityGatwar (295)
Taluk / tehsilBharari
DistrictBilaspur
StateHimachal Pradesh
Location fromSite boundary on record
Our referenceWID-HP-00216

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 27 Dec 2025Environmental approval granted7.5 acres₹10 lakh
Early planning filed 16 Dec 2024 (this page)Cleared for impact study7.5 acres₹10 lakh

In context

25 applications in Bilaspur since January 2022 are in the same category (Mining): 21 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.5 acres, this one is larger than 60% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 15.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.

Where it is

Gatwar (295), Bharari, Bilaspur, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Suresh Kumar in Bilaspur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.