Quick answers
What is this project?
Extraction of Sand, Stone, & Bajri from Khasra nos. 32 Measuring an area 3.05 Hectare (Private land, Hill slope) falling in Mauza/Mohal Talwara, Tehsil Ghumarwin, District Bilaspur, Himachal Pradesh by Sh. Suresh Kumar, Village Kuthera, Tehsil Ghumarwin & District Bilaspur, H.P is a proposed mining project in Gatwar (295), Bharari, Bilaspur, Himachal Pradesh. The site covers 7.5 acres.
Who is building it?
The applicant is Suresh Kumar.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 26 Apr 2025), as of 27 Nov 2026.
Where is it?
In Gatwar (295), Bharari, Bilaspur, Himachal Pradesh.
How big is it?
It has a stated cost of ₹10 lakh and a site of 7.5 acres.
When was it filed?
The application was filed on 16 Dec 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Extraction of Sand, Stone, & Bajri from Khasra nos. 32 Measuring an area 3.05 Hectare…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 26 Apr 2025 |
| Application filed | 16 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Suresh Kumar |
| Land area | 7.5 acres (3.1 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Gatwar (295) |
| Taluk / tehsil | Bharari |
| District | Bilaspur |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00216 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Dec 2025 | Environmental approval granted | 7.5 acres | ₹10 lakh |
| Early planning filed 16 Dec 2024 (this page) | Cleared for impact study | 7.5 acres | ₹10 lakh |
In context
25 applications in Bilaspur since January 2022 are in the same category (Mining): 21 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.5 acres, this one is larger than 60% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 15.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Gatwar (295), Bharari, Bilaspur, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Extraction of Sand, Stone, & Bajri from Khasra nos. 32 Measuring an area 3.05… — environmental approval granted, 0 m away
- Application for extension of EC validity for extraction sand, stone & bajri… — environmental approval granted, 200 m away
- Extraction of sand, stone & bajri from Khasra no.'s 161/1, 162/1, 173/132/4 &… — under environmental review, 1.8 km away
- C/O Link Road from Niun Salwan Ladda Km 0/00 to 1/00 — lapsed, 2.7 km away
- Industrial Area at Hatwar — more information requested, 4 km away
- C/o Jabal to Luhanoo Road Km 0/00 to 3/200 — lapsed, 4.5 km away
- C/o Aukal to Chandkufar Chuhani Road Km 0/00 to 5/600 — lapsed, 4.5 km away
- C/o Sundernagar Mairamasit via Beena Road Km 0/00 to 8/200 — lapsed, 4.5 km away
More from Suresh Kumar in Bilaspur
- Extraction of sand, stone & bajri from Khasra no.'s 161/1, 162/1, 173/132/4 &… — under environmental review
- Application for extension of EC validity for extraction sand, stone & bajri… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.