What is Developing? Open the mapMap

Environmental approval grantedMining · Bilaspur, Himachal Pradesh

Application for extension of EC validity for extraction sand, stone & bajri from Khasra No. 38/2 (Private Land, Hillslope/Terrace deposit) covering an area of 03-05-52 hectare or 40-12 Bighas, located in Mauza & Mohal Talwara, Tehsil Ghumarwain, District Bilaspur, H.P, proposed by Sh. Suresh Kumar, S/o Sh. Prabhu Dyal, V.P.O. Kuthera, Tehsil Ghumarwin, District Bilaspur, H.P.

Application for extension of EC validity for extraction sand, stone & bajri from Khasra No. 38/2 (Private Land, Hillslope/Terrace deposit) covering an area of 03-05-52 hectare or 40-12 Bighas, located in Mauza & Mohal Talwara, Tehsil Ghumarwain, District Bilaspur, H.P, proposed by Sh. Suresh Kumar, S/o Sh. Prabhu Dyal, V.P.O. Kuthera, Tehsil Ghumarwin, District Bilaspur, H.P is an approved mining project in Balli Lawana (338), Bharari, Bilaspur, Himachal Pradesh. The site covers 7.6 acres. Its stated project cost is ₹20 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 20 Aug 2026).

See it on the live map All projects in Bilaspur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Application for extension of EC validity for extraction sand, stone & bajri from Khasra No. 38/2 (Private Land, Hillslope/Terrace deposit) covering an area of 03-05-52 hectare or 40-12 Bighas, located in Mauza & Mohal Talwara, Tehsil Ghumarwain, District Bilaspur, H.P, proposed by Sh. Suresh Kumar, S/o Sh. Prabhu Dyal, V.P.O. Kuthera, Tehsil Ghumarwin, District Bilaspur, H.P is an approved mining project in Balli Lawana (338), Bharari, Bilaspur, Himachal Pradesh. The site covers 7.6 acres.

Who is building it?

The applicant is Suresh Kumar.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 20 Aug 2026), as of 27 Nov 2026.

Where is it?

In Balli Lawana (338), Bharari, Bilaspur, Himachal Pradesh.

How big is it?

It has a stated cost of ₹20 lakh and a site of 7.6 acres.

When was it filed?

The application was filed on 23 Jun 2026.

Project details

StatusEnvironmental approval granted
Status since20 Aug 2026
Application filed23 Jun 2026
Approval soughtEnvironmental approval
Application typeValidity extension
SectorMining
ApplicantSuresh Kumar
Land area7.6 acres (3.1 ha)
Project cost₹20 lakh
Village / localityBalli Lawana (338)
Taluk / tehsilBharari
DistrictBilaspur
StateHimachal Pradesh
Location fromSite boundary on record
Our referenceWID-HP-00729

In context

25 applications in Bilaspur since January 2022 are in the same category (Mining): 21 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.6 acres, this one is larger than 68% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 15.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.

Where it is

Balli Lawana (338), Bharari, Bilaspur, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Suresh Kumar in Bilaspur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.