Quick answers
What is this project?
Extraction of falling in Mauza Alampur, Mohal Bagh, Tehsil Jaisinghpur, District Kangra, Himachal Pradesh, Proposed by Sh. Andresh Syal, S/o Sh. Pritam Chand, Area 04-39-42 Hectares is a withdrawn mining project in Chhaner (59/11), Tira Sujanpur, Hamirpur, Himachal Pradesh. The site covers 10.8 acres.
Who is building it?
The applicant is Andresh Syal.
Has it been approved?
No. The application was withdrawn on 3 Dec 2024, so it is no longer under consideration.
Where is it?
In Chhaner (59/11), Tira Sujanpur, Hamirpur, Himachal Pradesh.
How big is it?
It has a stated cost of ₹30 lakh and a site of 10.8 acres.
When was it filed?
The application was filed on 20 Mar 2024.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 3 Dec 2024 |
| Application filed | 20 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Andresh Syal |
| Land area | 10.8 acres (4.4 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Chhaner (59/11) |
| Taluk / tehsil | Tira Sujanpur |
| District | Hamirpur |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00238 |
In context
51 applications in Hamirpur since January 2022 are in the same category (Mining): 38 approved, 8 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 10.8 acres, this one is larger than 53% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 14.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Chhaner (59/11), Tira Sujanpur, Hamirpur, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Extraction of Sand, Stone & Bajri falling in Mauza Alampur, Mohal Bagh, Tehsil… — cleared for impact study, 0 m away
- Extraction of Stone, Sand and Bajri falling in Mauza Alampur, Mohal Bagh,… — cleared for impact study, 250 m away
- Extraction of Stone, Sand and Bajri falling in Mauza Alampur, Mohal Bagh,… — cleared for impact study, 250 m away
- Extraction of Stone, Sand and Bajri falling in Mauza Alampur, Mohal Bagh,… — environmental approval granted, 250 m away
- Extraction of Sand, Stone and Bajri — environmental approval granted, 700 m away
- Extraction of Sand & Stone Bajri from Khasra No 1558/1 (Govt. Land & River… — withdrawn, 1000 m away
- Transfer of Environmental Clearance from letter no. SIA/HP/MIN/262685/2022… — environmental approval granted, 1.9 km away
- Extraction of Sand, Stone and Bajri falling in Mauza Rangar and Mohal Thana… — environmental approval granted, 3.4 km away
More from Andresh Syal in Hamirpur
- Extraction of Stone, Sand and Bajri falling in Mauza Alampur, Mohal Bagh,… — environmental approval granted
- Extraction of Sand, Stone & Bajri falling in Mauza Alampur, Mohal Bagh, Tehsil… — cleared for impact study
- Extraction of Stone, Sand and Bajri falling in Mauza Alampur, Mohal Bagh,… — cleared for impact study
- Extraction of Stone, Sand and Bajri falling in Mauza Alampur, Mohal Bagh,… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.