Quick answers
What is this project?
Extraction of Sand & Stone Bajri from Khasra No 1558/1 (Govt. Land & River Bed), measuring an area 15-03-30 Hectares ,falling in Mauza & Mohal Dhanyara & Alampur, Tehsil Dheera, District Kangra, H.P, Proposed by (GPA) Sh. Rohit Jamwal, S/o Sh. Om Prakash Jamwal & Sh. Rahul Pathania S/o Ranjeet Singh, Proposed Capacity-181350 TPA is a withdrawn mining project in Ghirind (56/9), Tira Sujanpur, Hamirpur, Himachal Pradesh. The site covers 9.6 acres.
Who is building it?
The applicant is Shiv Shakti Precast Industries.
Has it been approved?
No. The application was withdrawn on 3 Dec 2024, so it is no longer under consideration.
Where is it?
In Ghirind (56/9), Tira Sujanpur, Hamirpur, Himachal Pradesh.
How big is it?
It has a stated cost of ₹50 lakh and a site of 9.6 acres.
When was it filed?
The application was filed on 27 Nov 2024.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 3 Dec 2024 |
| Application filed | 27 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shiv Shakti Precast Industries |
| Land area | 9.6 acres (3.9 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Ghirind (56/9) |
| Taluk / tehsil | Tira Sujanpur |
| District | Hamirpur |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00334 |
In context
51 applications in Hamirpur since January 2022 are in the same category (Mining): 38 approved, 8 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 9.6 acres, this one is smaller than 53% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Ghirind (56/9), Tira Sujanpur, Hamirpur, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Extraction of Sand, Stone and Bajri — environmental approval granted, 750 m away
- Transfer of Environmental Clearance from letter no. SIA/HP/MIN/262685/2022… — environmental approval granted, 900 m away
- Extraction of Stone, Sand and Bajri falling in Mauza Alampur, Mohal Bagh,… — environmental approval granted, 900 m away
- Extraction of Stone, Sand and Bajri falling in Mauza Alampur, Mohal Bagh,… — cleared for impact study, 950 m away
- Extraction of Stone, Sand and Bajri falling in Mauza Alampur, Mohal Bagh,… — cleared for impact study, 950 m away
- Extraction of Sand, Stone & Bajri falling in Mauza Alampur, Mohal Bagh, Tehsil… — cleared for impact study, 1000 m away
- Extraction of falling in Mauza Alampur, Mohal Bagh, Tehsil Jaisinghpur,… — withdrawn, 1000 m away
- Extraction of Sand, Stone and Bajri falling in Mauza Rangar and Mohal Thana… — environmental approval granted, 4.2 km away
All 3 Shiv Shakti Precast projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.