Quick answers
What is Sand Stone and Bajri Mining Project by Sh Gurmeet Singh?
Sand Stone and Bajri Mining Project by Sh Gurmeet Singh is an approved mining project in Salhewal (130), Nalagarh, Solan, Himachal Pradesh. The site covers 11.1 acres.
Who is building it?
The applicant is Gurmeet singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Apr 2025), as of 27 Nov 2026.
Where is it?
In Salhewal (130), Nalagarh, Solan, Himachal Pradesh.
How big is it?
It has a stated cost of ₹14 lakh and a site of 11.1 acres.
When was it filed?
The application was filed on 22 Jan 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Apr 2025 |
| Application filed | 22 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Gurmeet singh |
| Land area | 11.1 acres (4.5 ha) |
| Project cost | ₹14 lakh |
| Village / locality | Salhewal (130) |
| Taluk / tehsil | Nalagarh |
| District | Solan |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00240 |
In context
70 applications in Solan since January 2022 are in the same category (Mining): 54 approved, 7 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 11.1 acres, this one is larger than 76% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Salhewal (130), Nalagarh, Solan, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand, Stone and Bajri Mining — withdrawn, 0 m away
- Expansion of the existing Steel Manufacturing Unit namely M/s Shree Siddi… — environmental approval granted, 200 m away
- Expansion of the existing Steel Manufacturing Unit namely M/s Shree Siddi… — environmental approval granted, 200 m away
- Riverbed Mining for Extraction of Sand, Stone & Bajri from Chikni Khad… — initial checks, 1.7 km away
- Amendment in EC granted under EIA Notification dated 14.09.2006 as amended… — environmental approval granted, 2.4 km away
- Diversion of 24.9 ha forest land for the setting up of Solar Power Project(13… — lapsed, 4.5 km away
- Extraction of sand, stone and bajri by Sh. Amarjit Singh Prop: M/s Sarsa Stone… — environmental approval granted, 4.7 km away
- Road Leading to Industrial Area at Kripalpur in Mohal Bir Plassi, Tehsil… — more information requested, 4.8 km away
More from Gurmeet singh in Solan
- Sand, Stone and Bajri Mining — withdrawn
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.