Quick answers
What is this project?
Diversion of 24.9 ha forest land for the setting up of Solar Power Project(13 MW)in village Bhangla Tehsil Nalagarh Distt. Solan under Nalagarh Forest Division is a lapsed power project in Androla Nihla (46), Nalagarh, Solan, Himachal Pradesh. The site covers 61.5 acres.
Who is building it?
The applicant is Manish Chaudhary.
Has it been approved?
No. The application was lapsed on 13 Dec 2024, so it is no longer under consideration.
Where is it?
In Androla Nihla (46), Nalagarh, Solan, Himachal Pradesh.
How big is it?
It has a stated cost of ₹74.6 crore; a site of 61.5 acres and 61.5 acres (24.9 ha) of forest land.
When was it filed?
The application was filed on 15 Oct 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Dec 2024 |
| Application filed | 15 Oct 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Manish Chaudhary |
| Land area | 61.5 acres (24.9 ha) |
| Forest land | 61.5 acres (24.9 ha) |
| Project cost | ₹74.6 crore |
| Village / locality | Androla Nihla (46) |
| Taluk / tehsil | Nalagarh |
| District | Solan |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-02523 |
In context
5 applications in Solan since January 2022 are in the same category (Power): 0 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Androla Nihla (46), Nalagarh, Solan, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Common Bio Medical Waste Treatment Facility by M/s Shivalik Solid Waste… — lapsed, 3.7 km away
- Extraction of sand, stone and bajri, from Khasra No's. 116, 117 and 118,… — under environmental review, 3.8 km away
- Mining of Sand, Stone, and Bajri from Riverbed Proposed by Sh. Sunil Garg… — lapsed, 4.1 km away
- Industrial project by M/s Greenlam Industries Limited — cleared for impact study, 4.2 km away
- Expansion of the existing Steel Manufacturing Unit namely M/s Shree Siddi… — environmental approval granted, 4.3 km away
- Expansion of the existing Steel Manufacturing Unit namely M/s Shree Siddi… — environmental approval granted, 4.3 km away
- Sand Stone and Bajri Mining Project by Sh Gurmeet Singh — environmental approval granted, 4.5 km away
- Sand, Stone and Bajri Mining — withdrawn, 4.5 km away
More from Manish Chaudhary in Solan
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.