What is Developing? Open the mapMap

Cleared for impact studyIndustry · Sirmaur, Himachal Pradesh

Proposed 30 KLPD Malt Spirit Distillery & Bottling Plant for IMFL/CL (60 Lacs cases Annually) by M/s. ADS Spirits Private Limited

Proposed 30 KLPD Malt Spirit Distillery & Bottling Plant for IMFL/CL (60 Lacs cases Annually) by M/s. ADS Spirits Private Limited is a proposed industrial project in Phandi Boriwala (161), Paonta Sahib, Sirmaur, Himachal Pradesh. The site covers 25.7 acres. Its stated project cost is ₹63 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 6 Mar 2025).

See it on the live map All projects in Sirmaur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed 30 KLPD Malt Spirit Distillery & Bottling Plant for IMFL/CL (60 Lacs cases…

Project details

Official titleProposed 30 KLPD Malt Spirit Distillery & Bottling Plant for IMFL/CL (60 Lacs cases Annually) along with 1.5 MW Co-generation Power Plant at Village Phandi Boriwala, Tehsil Paonta Sahib, District Sirmaur, Himachal Pradesh by M/s. ADS Spirits Private Limited
StatusCleared for impact study
Status since6 Mar 2025
Application filed20 Dec 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantADS Spirits private limited
Land area25.7 acres (10.4 ha)
Project cost₹63 crore
Village / localityPhandi Boriwala (161)
Taluk / tehsilPaonta Sahib
DistrictSirmaur
StateHimachal Pradesh
Location fromSite boundary on record
Our referenceWID-HP-00250

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 22 Oct 2025Environmental approval granted25.7 acres₹63 crore
Early planning filed 20 Dec 2024 (this page)Cleared for impact study25.7 acres₹63 crore

In context

12 applications in Sirmaur since January 2022 are in the same category (Industry): 6 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 25.7 acres, this one is larger than 67% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Phandi Boriwala (161), Paonta Sahib, Sirmaur, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 ADS Spirits projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.