What is this project?
Extraction of Sand, Stone & Bajri, at Khasra Nos. 2885/2713/1 & 2886/2713/1, Measuring an area 01-79-62 Hectares (Private land, Terrace deposit) Falling in Mauza/Mohal Raja Khas, Tehsil Indora, District Kangra, Himachal Pradesh, Proposed by Sh. Devi Singh, Partner M/s Jai Lakshmi Stone Crusher is a proposed mining project in Ban -Attarian (28), Indora, Kangra, Himachal Pradesh. The site covers 4.4 acres.
Who is building it?
The applicant is Devi Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 18 Oct 2024), as of 27 Nov 2026.
Where is it?
In Ban -Attarian (28), Indora, Kangra, Himachal Pradesh.
How big is it?
It has a stated cost of ₹25 lakh and a site of 4.4 acres.
When was it filed?
The application was filed on 9 Aug 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Extraction of Sand, Stone & Bajri, at Khasra Nos. 2885/2713/1 & 2886/2713/1, Measuring…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 18 Oct 2024 |
| Application filed | 9 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Devi Singh |
| Land area | 4.4 acres (1.8 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Ban -Attarian (28) |
| Taluk / tehsil | Indora |
| District | Kangra |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00322 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Mar 2025 | Environmental approval granted | 4.4 acres | ₹25 lakh |
| Early planning filed 9 Aug 2024 (this page) | Cleared for impact study | 4.4 acres | ₹25 lakh |
In context
131 applications in Kangra since January 2022 are in the same category (Mining): 91 approved, 25 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.4 acres, this one is smaller than 85% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 63 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.
Where it is
Ban -Attarian (28), Indora, Kangra, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Extraction of Sand, Stone & Bajri, at Khasra Nos. 2885/2713/1 & 2886/2713/1,… — environmental approval granted, 0 m away
- PROPOSED STONE SAND AND BAJRI MINING PROJECT AT MAUZA / MOHAL- BAIN ATTARIAN… — environmental approval granted, 200 m away
- PROPOSED SAND STONE AND BAJRI MINING PROJECT PROPOSED MINING LEASE AREA:… — environmental approval granted, 400 m away
- Extraction of sand, stone & bajri from Khasra No. 541, measuring an area of… — more information requested, 450 m away
- Extraction of sand, stone & bajri from Khasra No. 541, measuring an area of… — cleared for impact study, 450 m away
- Extraction of sand, stone & bajri from Khasra No. 541, measuring an area of… — withdrawn, 450 m away
- Extraction of sand, stone & bajri, from Khasra No. 180, measuring an area of… — under environmental review, 450 m away
- Extraction of sand, stone & bajri, from Khasra No. 180, measuring an area of… — cleared for impact study, 450 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.