What is Developing? Open the mapMap

Cleared for impact studyMining · Kangra, Himachal Pradesh

Extraction of sand, stone & bajri from Khasra No. 541, measuring an area of 05-42-95 Hectares (Private Land, Terrace Deposit/River Bed) falling in Mauza/Mohal Bain Attarian, Tehsil Indora, District Kangra, Himachal Pradesh, proposed by Sh. Karan Singh Pathania, Prop. M/s KK Grit Gram Udyog Stone Crusher.

Extraction of sand, stone & bajri from Khasra No. 541, measuring an area of 05-42-95 Hectares (Private Land, Terrace Deposit/River Bed) falling in Mauza/Mohal Bain Attarian, Tehsil Indora, District Kangra, Himachal Pradesh, proposed by Sh. Karan Singh Pathania, Prop. M/s KK Grit Gram Udyog Stone Crusher is a proposed mining project in Indpur (33), Indora, Kangra, Himachal Pradesh. The site covers 13.4 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 4 Dec 2025).

See it on the live map All projects in Kangra

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Extraction of sand, stone & bajri from Khasra No. 541, measuring an area of 05-42-95 Hectares (Private Land, Terrace Deposit/River Bed) falling in Mauza/Mohal Bain Attarian, Tehsil Indora, District Kangra, Himachal Pradesh, proposed by Sh. Karan Singh Pathania, Prop. M/s KK Grit Gram Udyog Stone Crusher is a proposed mining project in Indpur (33), Indora, Kangra, Himachal Pradesh. The site covers 13.4 acres.

Who is building it?

The applicant is K K Grit Udyog.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 4 Dec 2025), as of 27 Nov 2026.

Where is it?

In Indpur (33), Indora, Kangra, Himachal Pradesh.

How big is it?

It has a stated cost of ₹50 lakh and a site of 13.4 acres.

When was it filed?

The application was filed on 31 Oct 2025.

Project details

StatusCleared for impact study
Status since4 Dec 2025
Application filed31 Oct 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantK K Grit Udyog
Land area13.4 acres (5.4 ha)
Project cost₹50 lakh
Village / localityIndpur (33)
Taluk / tehsilIndora
DistrictKangra
StateHimachal Pradesh
Location fromSite boundary on record
Our referenceWID-HP-00527

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 16 Oct 2026More information requested13.4 acres₹50 lakh
Early planning filed 31 Oct 2025 (this page)Cleared for impact study13.4 acres₹50 lakh

In context

131 applications in Kangra since January 2022 are in the same category (Mining): 91 approved, 25 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 13.4 acres, this one is larger than 73% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 42.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.

Where it is

Indpur (33), Indora, Kangra, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.