Quick answers
What is this project?
Extraction of sand, stone & bajri from Khasra Nos. 726 & 727 (private land and riverbed), covering an area of 02-80-52 hectares, located in Mohal Maira Batrah, Mauza Maira Doomal, Tehsil Nurpur, District Kangra, Himachal Pradesh, Proposed by Sh. Sham Singh, Partner at M/s Nandi Stone Crusher, with a production capacity of 114,570 TPA is an approved mining project in Aundi Khas (100), Nurpur, Kangra, Himachal Pradesh. The site covers 6.9 acres.
Who is building it?
The applicant is Nandi Stone Crushing Co.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Mar 2026), as of 27 Nov 2026.
Where is it?
In Aundi Khas (100), Nurpur, Kangra, Himachal Pradesh.
How big is it?
It has a stated cost of ₹25 lakh and a site of 6.9 acres.
When was it filed?
The application was filed on 30 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Mar 2026 |
| Application filed | 30 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Nandi Stone Crushing Co |
| Land area | 6.9 acres (2.8 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Aundi Khas (100) |
| Taluk / tehsil | Nurpur |
| District | Kangra |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00353 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Dec 2025 (this page) | Environmental approval granted | 6.9 acres | ₹25 lakh |
| Early planning filed 7 Mar 2025 | Cleared for impact study | 6.9 acres | ₹25 lakh |
In context
131 applications in Kangra since January 2022 are in the same category (Mining): 91 approved, 25 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 6.9 acres, this one is smaller than 69% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 97.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Aundi Khas (100), Nurpur, Kangra, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Extraction of sand, stone & bajri from Khasra Nos. 726 & 727 (private land and… — cleared for impact study, 0 m away
- Collection/ Extraction of Sand, Stone & Bajri by Sh. Vipul Sehgal, through… — environmental approval granted, 150 m away
- Maira Batrah Sand, Stone & Bajri Quarry Lease Project — withdrawn, 150 m away
- Maira Batrah Sand, Stone & Bajri Quarry Lease Project — cleared for impact study, 150 m away
- Application for extension of EC validity proposal for extraction Sand, Stone… — environmental approval granted, 200 m away
- Amendment in Environmental Clearance for the Increase in Mine Production of… — lapsed, 250 m away
- Extraction of sand, stone & bajri from Khasra No.724 (Private land/Terrace… — lapsed, 300 m away
- Extraction of Sand Stone & Bajri by Sh. Ravi Verma Prop; M/s Shree Ram Stone… — environmental approval granted, 600 m away
More from Nandi Stone Crushing Co in Kangra
- Extension in the validity of EC for Extraction of sand, stone & bajri in the… — environmental approval granted
All 3 Nandi Stone Crushing Co projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.