What is Developing? Open the mapMap

LapsedMining · Kangra, Himachal Pradesh

Extraction of sand, stone & bajri from Khasra No.724 (Private land/Terrace deposit & River bed), measuring an area 04-04-67 Hectares falling in Mauza/Mohal Maira Doomal/Maira Batrah, Tehsil Nurpur, District Kangra, Himachal Pradesh, proposed by Sh. Ashok Indoria, Prop M/s Ankur Stone Crusher

Extraction of sand, stone & bajri from Khasra No.724 (Private land/Terrace deposit & River bed), measuring an area 04-04-67 Hectares falling in Mauza/Mohal Maira Doomal/Maira Batrah, Tehsil Nurpur, District Kangra, Himachal Pradesh, proposed by Sh. Ashok Indoria, Prop M/s Ankur Stone Crusher is a lapsed mining project in Aundi Khas (100), Nurpur, Kangra, Himachal Pradesh. The site covers 10 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 15 May 2026).

See it on the live map All projects in Kangra

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Extraction of sand, stone & bajri from Khasra No.724 (Private land/Terrace deposit & River bed), measuring an area 04-04-67 Hectares falling in Mauza/Mohal Maira Doomal/Maira Batrah, Tehsil Nurpur, District Kangra, Himachal Pradesh, proposed by Sh. Ashok Indoria, Prop M/s Ankur Stone Crusher is a lapsed mining project in Aundi Khas (100), Nurpur, Kangra, Himachal Pradesh. The site covers 10 acres.

Who is building it?

The applicant is Ashok Kumar.

Has it been approved?

No. The application was lapsed on 15 May 2026, so it is no longer under consideration.

Where is it?

In Aundi Khas (100), Nurpur, Kangra, Himachal Pradesh.

How big is it?

It has a stated cost of ₹50 lakh and a site of 10 acres.

When was it filed?

The application was filed on 15 May 2026.

Project details

StatusLapsed
Status since15 May 2026
Application filed15 May 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAshok Kumar
Land area10 acres (4.1 ha)
Project cost₹50 lakh
Village / localityAundi Khas (100)
Taluk / tehsilNurpur
DistrictKangra
StateHimachal Pradesh
Location fromSite boundary on record
Our referenceWID-HP-00738

In context

131 applications in Kangra since January 2022 are in the same category (Mining): 91 approved, 25 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 10 acres, this one is smaller than 51% of them.

6 other mining leases have applied within 500 m of this site; together with this one they cover 104.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.

Where it is

Aundi Khas (100), Nurpur, Kangra, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ashok Kumar in Kangra

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.