Quick answers
What is this project?
Common Bio Medical Waste Treatment Facility by M/s Shivalik Solid Waste Management Ltd is a lapsed waste management project in Majra (97), Nalagarh, Solan, Himachal Pradesh. The site covers 1.5 acres.
Who is building it?
The applicant is Shivalik Solid Waste Management Limited.
Has it been approved?
No. The application was lapsed on 5 Aug 2025, so it is no longer under consideration.
Where is it?
In Majra (97), Nalagarh, Solan, Himachal Pradesh.
How big is it?
It has a stated cost of ₹16 crore and a site of 1.5 acres.
When was it filed?
The application was filed on 1 Apr 2025.
Project details
| Official title | Common Bio Medical Waste Treatment Facility proposed at Village Majra, Post Office Dabhota, Tehsil Nalagarh, Distt. Solan, Himachal Pradesh by M/s Shivalik Solid Waste Management Ltd. |
|---|---|
| Status | Lapsed |
| Status since | 5 Aug 2025 |
| Application filed | 1 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Waste management |
| Applicant | Shivalik Solid Waste Management Limited |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹16 crore |
| Village / locality | Majra (97) |
| Taluk / tehsil | Nalagarh |
| District | Solan |
| State | Himachal Pradesh |
| Location from | Site area on record |
| Our reference | WID-HP-00423 |
In context
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Majra (97), Nalagarh, Solan, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Extraction of sand, stone and bajri, from Khasra No's. 116, 117 and 118,… — under environmental review, 2.1 km away
- Extension in the "Validity & Transfer" of Environmental Clearance for… — environmental approval granted, 3.2 km away
- Diversion of 24.9 ha forest land for the setting up of Solar Power Project(13… — lapsed, 3.7 km away
- Proposed Grain Based Distillery for manufacturing of capacity 100KLD of… — environmental approval granted, 3.7 km away
- Diversion of 40.06 ha forest land in favour of DGM (E) cum HoP Solar Power… — lapsed, 4 km away
- Extraction of sand, stone and bajri by Sh. Amarjit Singh Prop: M/s Sarsa Stone… — environmental approval granted, 4.4 km away
- Road Leading to Industrial Area at Kripalpur in Mohal Bir Plassi, Tehsil… — more information requested, 6 km away
- Expansion of the existing Steel Manufacturing Unit namely M/s Shree Siddi… — environmental approval granted, 6.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.