Quick answers
What is this project?
Hill Slope Mining for extraction of Stone proposed by Sh. Pratap Singh Partner M/s Pratap Stone Crusher is a lapsed mining project in Na, Lahul, Lahul & Spiti, Himachal Pradesh. The site covers 11.8 acres.
Who is building it?
The applicant is Pratap Stone Crusher.
Has it been approved?
No. The application was lapsed on 19 Feb 2025, so it is no longer under consideration.
Where is it?
In Na, Lahul, Lahul & Spiti, Himachal Pradesh.
How big is it?
It has a stated cost of ₹10 lakh and a site of 11.8 acres.
When was it filed?
The application was filed on 19 Feb 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Hill Slope Mining for extraction of Stone proposed by Sh. Pratap Singh Partner M/s…
Project details
| Status | Lapsed |
|---|---|
| Status since | 19 Feb 2025 |
| Application filed | 19 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Pratap Stone Crusher |
| Land area | 11.8 acres (4.8 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Na |
| Taluk / tehsil | Lahul |
| District | Lahul & Spiti |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00424 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 19 Feb 2025 (this page) | Lapsed | 11.8 acres | ₹10 lakh |
| New project filed 19 Dec 2024 | Environmental approval granted | 11.8 acres | ₹10 lakh |
In context
5 applications in Lahul & Spiti since January 2022 are in the same category (Mining): 3 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected.
No other mining lease on record has applied within 5 km of this site.
Where it is
Na, Lahul, Lahul & Spiti, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Hill Slope Mining for extraction of Stone proposed by Sh. Pratap Singh Partner… — environmental approval granted, 0 m away
- Provisioning of (0.96 ha) Forest Land for Temporary Stone Crusher at Km… — lapsed, 1.7 km away
- Re-diversion of 23.481 Hect land for Re-alignment of Sumdo Kaza Gramphoo road… — more information requested, 5.4 km away
- Mobile Tower to provide Telecommunication Line/Facility — lapsed, 27 km away
- Heliport at Sissu — lapsed, 27.6 km away
- Construction of Heliport at Sissu — lapsed, 27.6 km away
- Shree Raja Ghepan Cricket Khel Maidan evam Sheetkaleen Khel Parisar at Sissu,… — lapsed, 28.2 km away
- Mobile Tower to provide Telecommunication Line/Facility — lapsed, 37.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.