Quick answers
What is this project?
Provisioning of (0.96 ha) Forest Land for Temporary Stone Crusher at Km 192.400 for Sumdo-Kaza-Gramphoo road construction, in favour of Dhariwal Buildtech Limited C/o Officer Commanding, 94 RCC (BRO), C/O 56 APO is a lapsed building project in Yari-Khoksar (14/11), Lahul, Lahul & Spiti, Himachal Pradesh. The site covers 16 acres.
Who is building it?
The applicant is Dhariwal Buildtech Limited.
Has it been approved?
No. The application was lapsed on 1 May 2025, so it is no longer under consideration.
Where is it?
In Yari-Khoksar (14/11), Lahul, Lahul & Spiti, Himachal Pradesh.
How big is it?
It has a stated cost of ₹3.8 crore; a site of 16 acres and 2.4 acres (1 ha) of forest land.
When was it filed?
The application was filed on 3 Oct 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 1 May 2025 |
| Application filed | 3 Oct 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Dhariwal Buildtech Limited |
| Land area | 16 acres (6.5 ha) |
| Forest land | 2.4 acres (1 ha) |
| Project cost | ₹3.8 crore |
| Village / locality | Yari-Khoksar (14/11) |
| Taluk / tehsil | Lahul |
| District | Lahul & Spiti |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-01691 |
In context
36 applications in Lahul & Spiti since January 2022 are in the same category (Buildings & townships): 0 approved, 1 filed or under review, and 35 withdrawn, lapsed or rejected. At 16 acres, this one is larger than 94% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Yari-Khoksar (14/11), Lahul, Lahul & Spiti, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Hill Slope Mining for extraction of Stone proposed by Sh. Pratap Singh Partner… — lapsed, 1.7 km away
- Hill Slope Mining for extraction of Stone proposed by Sh. Pratap Singh Partner… — environmental approval granted, 1.7 km away
- Re-diversion of 23.481 Hect land for Re-alignment of Sumdo Kaza Gramphoo road… — more information requested, 6.7 km away
- Heliport at Sissu — lapsed, 25.9 km away
- Construction of Heliport at Sissu — lapsed, 25.9 km away
- Shree Raja Ghepan Cricket Khel Maidan evam Sheetkaleen Khel Parisar at Sissu,… — lapsed, 26.6 km away
- Mobile Tower to provide Telecommunication Line/Facility — lapsed, 27.9 km away
- Construction of Heliport at Jispa — lapsed, 37.1 km away
All 4 Dhariwal Buildtech projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.