Quick answers
What is this project?
Expansion of production capacity for extraction of Sand & Stone Bajri from Khasra No 1896/1411/1 (old khasra no. 1411/1) (Govt. Land & River Bed), measuring an area 04-15-02 Hectares falling in Mohal Ghandwal, Mauza Baranda Ghandwal Tehsil Nurpur, District Kangra, Himachal Pradesh proposed by Sh. Ashok Indoria, Prop M/s Ankur Stone Crusher is a proposed mining project in Thora Khas (51), Nurpur, Kangra, Himachal Pradesh. The site covers 10.3 acres.
Who is building it?
The applicant is Ashok Kumar.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Thora Khas (51), Nurpur, Kangra, Himachal Pradesh.
How big is it?
It has a stated cost of ₹50 lakh and a site of 10.3 acres.
When was it filed?
The application was filed on 10 Nov 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 21 Sept 2026 |
| Application filed | 10 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ashok Kumar |
| Land area | 10.3 acres (4.2 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Thora Khas (51) |
| Taluk / tehsil | Nurpur |
| District | Kangra |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00506 |
In context
131 applications in Kangra since January 2022 are in the same category (Mining): 91 approved, 25 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 10.3 acres, this one is larger than 53% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Thora Khas (51), Nurpur, Kangra, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Extraction of sand, stone & bajri by Sh. Ashok Indoria Prop: M/s Ankur Stone… — environmental approval granted, 0 m away
- Extension in the validity of EC for Extraction of sand, stone & bajri in the… — environmental approval granted, 650 m away
- Extraction/collection of Sand, Stone and Bajri from an area measuring 04-04-80… — environmental approval granted, 2.5 km away
- Extension in the "Validity & Transfer" of Environmental Clearance for… — not approved, 2.5 km away
- Extraction of sand, stone & bajri from Khasra No. 679/1, measuring 04-61-87… — environmental approval granted, 3.5 km away
- Diversion of Forest land for Rehabilitation and Upgradation to Four Lane… — forest land use approved, 4 km away
- Diversion of Forest land for Rehabilitation and Upgradation to Four Lane… — lapsed, 4 km away
- Extraction of Sand, Stone & Bajri from Khasra Nos. 350, 351 & 352 (Private… — cleared for impact study, 5.3 km away
More from Ashok Kumar in Kangra
- Extraction of sand, stone & bajri from Khasra No.724 (Private land/Terrace… — lapsed
- Extraction of sand, stone & bajri by Sh. Ashok Indoria Prop: M/s Ankur Stone… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.