Quick answers
What is "Stone Mining Project, Khasra No. 191/97/2"?
"Stone Mining Project, Khasra No. 191/97/2" is an approved mining project in Bargiyana (52), Kandaghat, Solan, Himachal Pradesh. The site covers 4.8 acres.
Who is building it?
The applicant is Ramesh Chand.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 Apr 2025), as of 27 Nov 2026.
Where is it?
In Bargiyana (52), Kandaghat, Solan, Himachal Pradesh.
How big is it?
It has a stated cost of ₹50 lakh and a site of 4.8 acres.
When was it filed?
The application was filed on 27 Feb 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 Apr 2025 |
| Application filed | 27 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ramesh Chand |
| Land area | 4.8 acres (2 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Bargiyana (52) |
| Taluk / tehsil | Kandaghat |
| District | Solan |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00524 |
In context
70 applications in Solan since January 2022 are in the same category (Mining): 54 approved, 7 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.8 acres, this one is larger than 53% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Bargiyana (52), Kandaghat, Solan, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment in EC of Proposed Hotel & Resort By M/s Luxus Hotel and Resorts LLP.… — withdrawn, 3.9 km away
- Hill Slope Mining for extraction of Stone proposed by Sh. Ganesh Dutt Sharma… — environmental approval granted, 5 km away
- Proposed Housing colony/Apartments by M/s Karol View Developers Pvt. Ltd. — lapsed, 6.2 km away
- Stone mining Project, Khasra No. 443/147/1 — environmental approval granted, 6.5 km away
- Diversion of 0-91-35 Hac. Land for "preparation of Complete Fca for Shifting… — lapsed, 6.7 km away
- Diversion of 0-91-35 Hac. Land for "preparation of Complete Fca for Shifting… — in-principle approval, conditions pending, 6.7 km away
- Extraction of Stone falling by Sh. Rameshwar Dass Prop M/s Geeta Industries — environmental approval granted, 6.8 km away
- Mobile Tower for providing Telecommunication Line/Facilities — lapsed, 7.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.