In-principle approval, conditions pendingPower · Solan, Himachal Pradesh

Diversion of 0-91-35 Hac. Land for "preparation of Complete Fca for Shifting of Existing Tower No. 72a Back Side of Bahara University at Vaknaghat of 66KV Transmission Line From Parwanoo to Shimla Coming in the Way of Four Laning of NH -05 From Chambaghat to Kaithlighat".

Diversion of 0-91-35 Hac. Land for "preparation of Complete Fca for Shifting of Existing Tower No. 72a Back Side of Bahara University at Vaknaghat of 66KV Transmission Line From Parwanoo to Shimla Coming in the Way of Four Laning of NH -05 From Chambaghat to Kaithlighat" is a proposed power project in Bisha (423), Kandaghat, Solan, Himachal Pradesh. The site covers 18.6 acres. Its stated project cost is ₹9 lakh. As of 27 Nov 2026, its status is “In-principle approval, conditions pending” (since 30 Apr 2026).

See it on the live map All projects in Solan

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 0-91-35 Hac. Land for "preparation of Complete Fca for Shifting of Existing Tower No. 72a Back Side of Bahara University at Vaknaghat of 66KV Transmission Line From Parwanoo to Shimla Coming in the Way of Four Laning of NH -05 From Chambaghat to Kaithlighat" is a proposed power project in Bisha (423), Kandaghat, Solan, Himachal Pradesh. The site covers 18.6 acres.

Who is building it?

The applicant is Hpsebl.

Has it been approved?

Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.

Where is it?

In Bisha (423), Kandaghat, Solan, Himachal Pradesh.

How big is it?

It has a stated cost of ₹9 lakh; a site of 18.6 acres and 2.3 acres (0.9 ha) of forest land.

When was it filed?

The application was filed on 14 Jun 2023.

Project details

StatusIn-principle approval, conditions pending
Status since30 Apr 2026
Application filed14 Jun 2023
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantHpsebl
Land area18.6 acres (7.5 ha)
Forest land2.3 acres (0.9 ha)
Project cost₹9 lakh
Village / localityBisha (423)
Taluk / tehsilKandaghat
DistrictSolan
StateHimachal Pradesh
Location fromSite boundary on record
Our referenceWID-HP-01826

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 9 Jun 2025Lapsed18.6 acres₹9 lakh
New project filed 14 Jun 2023 (this page)In-principle approval, conditions pending18.6 acres₹9 lakh

In context

5 applications in Solan since January 2022 are in the same category (Power): 0 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bisha (423), Kandaghat, Solan, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.