Quick answers
What is this project?
Sand and Stone Mining Project Area 12-01-00 Bighas (0.9068 Ha) Village Mauza Barota , Tehsil Kasauli & District Solan (H.P) is an approved mining project in Bughar Kanaitan (387), Krishangarh, Solan, Himachal Pradesh. The site covers 2.2 acres.
Who is building it?
The applicant is Rakesh Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 Dec 2025), as of 27 Nov 2026.
Where is it?
In Bughar Kanaitan (387), Krishangarh, Solan, Himachal Pradesh.
How big is it?
It has a stated cost of ₹10 lakh and a site of 2.2 acres.
When was it filed?
The application was filed on 19 Jun 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 Dec 2025 |
| Application filed | 19 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rakesh Kumar |
| Land area | 2.2 acres (0.9 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Bughar Kanaitan (387) |
| Taluk / tehsil | Krishangarh |
| District | Solan |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-00540 |
In context
70 applications in Solan since January 2022 are in the same category (Mining): 54 approved, 7 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.2 acres, this one is smaller than 67% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Bughar Kanaitan (387), Krishangarh, Solan, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Hill Slope Mining for extraction of Stone proposed by Sh. Varun Sharma S/o Sh… — environmental approval granted, 1.3 km away
- Stone Mining Project — environmental approval granted, 2.9 km away
- Extension of EC Validity for residential project by M/s Delanco Relators Pvt.… — lapsed, 4.6 km away
- Link Road From Shardighat to Ghmbrolla Pull Via Chayavni Via Parwat Raj Mandir… — initial checks, 5 km away
- Hill Slope Mining for extraction of Stone proposed by Sh. Ganesh Dutt Sharma… — environmental approval granted, 6.2 km away
- Mobile Tower for providing Telecommunication Line/Facilities — lapsed, 8.4 km away
- Extraction of sand, stone and bajri from Khasra No's. 1/1, 21 & 1/2/1,… — environmental approval granted, 8.6 km away
- "Sand, Stone and Bajri Mining Project" — environmental approval granted, 8.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.