What is Developing? Open the mapMap

In-principle approval, conditions pendingWater & irrigation · Kullu, Himachal Pradesh

Bhang Hydroelectric Power Project

Bhang Hydroelectric Power Project is a proposed water and irrigation project in Up Muhal Kulang, Manali, Kullu, Himachal Pradesh. The site covers 22.7 acres. Its stated project cost is ₹53.7 crore. As of 27 Nov 2026, its status is “In-principle approval, conditions pending” (since 17 Nov 2026).

See it on the live map All projects in Kullu

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusIn-principle approval, conditions pending
Status since17 Nov 2026
Application filed4 May 2025
Approval soughtForest land use
Application typeOwnership transfer
SectorWater & irrigation
ApplicantSai Eternal Foundation
Land area22.7 acres (9.2 ha)
Forest land7.6 acres (3.1 ha)
Project cost₹53.7 crore
Village / localityUp Muhal Kulang
Taluk / tehsilManali
DistrictKullu
StateHimachal Pradesh
Location fromSite boundary on record
Our referenceWID-HP-01026

In context

28 applications in Kullu since January 2022 are in the same category (Water & irrigation): 0 approved, 9 filed or under review, and 19 withdrawn, lapsed or rejected. At 22.7 acres, this one is larger than 85% of them.

11 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Up Muhal Kulang, Manali, Kullu, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Sai Eternal Foundation in Kullu

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.