Project details
| Status | Under forest review |
|---|---|
| Status since | 13 Nov 2026 |
| Application filed | 12 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | HIMACHAL PRADESH STaTE FOREST DEVELOPMENT CORPORATION LIMITED |
| Land area | 49.7 acres (20.1 ha) |
| Forest land | 49.7 acres (20.1 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Up Muhal Buruwa Majhach |
| Taluk / tehsil | Manali |
| District | Kullu |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-01672 |
In context
32 applications in Kullu since January 2022 are in the same category (Mining): 15 approved, 9 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 49.7 acres, this one is larger than 94% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Up Muhal Buruwa Majhach, Manali, Kullu, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- C/o Plastic Waste Management Unit at Muhal Bahang, Tehsil Manali, Distt. Kullu… — lapsed, 500 m away
- Parsha Shanag — lapsed, 750 m away
- Launching of the World's First Rope Swing Backed by Artificial Intelligence in… — lapsed, 1.1 km away
- Extraction of Sand, Stone and Bajri by Shri Raj Kumar Sood — more information requested, 1.3 km away
- Ice Skating Ring (Stadium Winter Sports) — lapsed, 1.5 km away
- Bhang Hydroelectric Power Project — in-principle approval, conditions pending, 1.9 km away
- Bye Pass Road NH-03 (Saba Restaurant) to Club House Manali Km 0/0 to 1/800 — lapsed, 2.8 km away
- Mining of Sand, Stone & Bajri from Sarai Nala situated in Mauza Palchan &… — returned to applicant, 4.3 km away
More from HIMACHAL PRADESH STaTE FOREST DEVELOPMENT CORPORATION LIMITED in Kullu
- DIVERSION OF 3.54 HECTARE FOREST LAND(Shirar-2) FOR THE VULNERABLE SITES FOR… — lapsed
- Diversion of 6.7207 Hectare Forest Land for the Vulnerable Sites for the… — under forest review
- Dredging in river Beas from Garbage Treatment plant to Bahanu Bridge… — under forest review
- Diversion of 8.8725 Ha Forest Land for the Sites I.E. Dohlunala and Raison for… — more information requested
- Diversion of 27.5371 Forest Land for the Vulnerable Identified Sites for the… — more information requested
- Extraction of sand, stone and bajri from Tukra No. 1, measuring 04-38-00… — environmental approval granted
10 HIMACHAL PRADESH STaTE FOREST DEVELOPMENT CORPORATION projects in Kullu
All 11 HIMACHAL PRADESH STaTE FOREST DEVELOPMENT CORPORATION projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.