Quick answers
What is this project?
Construction of 33 KV HT line from Shahpur to Lunj Distt. Kangra (HP) is a lapsed power project in Basnur Khas (129), Shahpur, Kangra, Himachal Pradesh. The site covers 2,517.3 acres.
Who is building it?
The applicant is Angrej Singh.
Has it been approved?
No. The application was lapsed on 22 Sept 2023, so it is no longer under consideration.
Where is it?
In Basnur Khas (129), Shahpur, Kangra, Himachal Pradesh.
How big is it?
It has a stated cost of ₹2.7 crore; a site of 2,517.3 acres and 39.4 acres (15.9 ha) of forest land.
When was it filed?
The application was filed on 18 Jun 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Sept 2023 |
| Application filed | 18 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Angrej Singh |
| Land area | 2,517.3 acres (1,018.7 ha) |
| Forest land | 39.4 acres (15.9 ha) |
| Project cost | ₹2.7 crore |
| Village / locality | Basnur Khas (129) |
| Taluk / tehsil | Shahpur |
| District | Kangra |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-01059 |
In context
6 applications in Kangra since January 2022 are in the same category (Power): 1 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Basnur Khas (129), Shahpur, Kangra, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 33 KV HT line from shahpur to lunj, Electrical Division, HPSEBL Shahpur,… — lapsed, 1.4 km away
- Link Road from Tatwani Langha Tarmuda Mawa Road — more information requested, 2.8 km away
- Link Road From Tharkhankar to Sanour Lahar Km 0/00 to 2/075 — lapsed, 3 km away
- Proposed 30 KLD Malt Spirit Distillery and 2 KLD Craft Gin Plant by M/s Angus… — cleared for impact study, 3.5 km away
- Construction of Link Road to Tind Basti Trembla Km 0/00 to 1/100 — lapsed, 3.5 km away
- Proposed 30 KLD Malt Spirit Distillery and 2 KLD Craft Gin Plant by M/s Angus… — initial checks, 3.5 km away
- Proposed 30 KLD Malt Spirit Distillery and 2 KLD Craft Gin Plant by M/s Angus… — environmental approval granted, 3.5 km away
- Water Tank, Pump House, Water Pipeline and Approach Road for Setting-up a Malt… — lapsed, 3.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.