Quick answers
What is this project?
33 KV HT line from shahpur to lunj, Electrical Division, HPSEBL Shahpur, Distt. Kangra (H.P) is a lapsed power project in Ranehr Khas (71), Shahpur, Kangra, Himachal Pradesh. The site covers 51.4 acres.
Who is building it?
The applicant is Executive Engineer Hpsebl Dalhousie.
Has it been approved?
No. The application was lapsed on 23 Mar 2024, so it is no longer under consideration.
Where is it?
In Ranehr Khas (71), Shahpur, Kangra, Himachal Pradesh.
How big is it?
It has a stated cost of ₹2.7 crore; a site of 51.4 acres and 39.4 acres (15.9 ha) of forest land.
When was it filed?
The application was filed on 31 Dec 2023.
Project details
| Official title | Construction of 33 KV HT line from shahpur to lunj, Electrical Division, HPSEBL Shahpur, Distt. Kangra (H.P) |
|---|---|
| Status | Lapsed |
| Status since | 23 Mar 2024 |
| Application filed | 31 Dec 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Executive Engineer Hpsebl Dalhousie |
| Land area | 51.4 acres (20.8 ha) |
| Forest land | 39.4 acres (15.9 ha) |
| Project cost | ₹2.7 crore |
| Village / locality | Ranehr Khas (71) |
| Taluk / tehsil | Shahpur |
| District | Kangra |
| State | Himachal Pradesh |
| Location from | Site area on record |
| Our reference | WID-HP-02076 |
In context
6 applications in Kangra since January 2022 are in the same category (Power): 1 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ranehr Khas (71), Shahpur, Kangra, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of 33 KV HT line from Shahpur to Lunj Distt. Kangra (HP) — lapsed, 1.4 km away
- Link Road from Tatwani Langha Tarmuda Mawa Road — more information requested, 3.6 km away
- Link Road From Tharkhankar to Sanour Lahar Km 0/00 to 2/075 — lapsed, 4.3 km away
- Proposed 30 KLD Malt Spirit Distillery and 2 KLD Craft Gin Plant by M/s Angus… — cleared for impact study, 4.6 km away
- Proposed 30 KLD Malt Spirit Distillery and 2 KLD Craft Gin Plant by M/s Angus… — initial checks, 4.6 km away
- Proposed 30 KLD Malt Spirit Distillery and 2 KLD Craft Gin Plant by M/s Angus… — environmental approval granted, 4.6 km away
- Water Tank, Pump House, Water Pipeline and Approach Road for Setting-up a Malt… — lapsed, 4.6 km away
- Construction of Link Road to Tind Basti Trembla Km 0/00 to 1/100 — lapsed, 4.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.