Project details
| Status | More information requested |
|---|---|
| Status since | 26 Nov 2026 |
| Application filed | 5 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Everest Power Private Limited |
| Land area | 69.8 acres (28.2 ha) |
| Forest land | 6.6 acres (2.7 ha) |
| Project cost | ₹3 crore |
| Village / locality | Malana (24/44) |
| Taluk / tehsil | Bhuntar |
| District | Kullu |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-01262 |
In context
5 applications in Kullu since January 2022 are in the same category (Power): 1 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Malana (24/44), Bhuntar, Kullu, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Toshak Small Hydro Electric Project (1.0 MW) — lapsed, 2.6 km away
- Lower Malana MHEP (100 kW) — lapsed, 3.2 km away
- Jail Hydro 100 KW — lapsed, 4.4 km away
- 132kV D/C Transmission Line from 33/132 KV GIS Sub- Station Barsaini to… — more information requested, 4.9 km away
- Choj — lapsed, 6.1 km away
- Wachin Shep (1.50 MW) — more information requested, 6.8 km away
- Kasol Hydro Power Project — lapsed, 7.6 km away
- Lower Brahamganga-II (0.30 MW) SHEP — under forest review, 9.3 km away