Initial checksRoads & highways · Solan, Himachal Pradesh

Diversion of 4.7644 Ha. Additional Forest Land Requirement for Four Laning of NH-05 From Kaithlighat Village to Shakral Section (Shimla Bypass Package I From Km 128.835 to Km 146.300 for Design Length – 17.465 Km) in Already Approved Alignment in the Entire Section From Kaithlighat to Dhalli

Diversion of 4.7644 Ha. Additional Forest Land Requirement for Four Laning of NH-05 From Kaithlighat Village to Shakral Section (Shimla Bypass Package I From Km 128.835 to Km 146.300 for Design Length – 17.465 Km) in Already Approved Alignment in the Entire Section From Kaithlighat to Dhalli is a proposed road project in Dharot (51), Solan, Himachal Pradesh. The site covers 20.3 acres. Its stated project cost is ₹170.4 crore. As of 27 Nov 2026, its status is “Initial checks” (since 10 Sept 2026).

See it on the live map All projects in Solan

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 4.7644 Ha. Additional Forest Land Requirement for Four Laning of NH-05 From Kaithlighat Village to Shakral Section (Shimla Bypass Package I From Km 128.835 to Km 146.300 for Design Length – 17.465 Km) in Already Approved Alignment in the Entire Section From Kaithlighat to Dhalli is a proposed road project in Dharot (51), Solan, Himachal Pradesh. The site covers 20.3 acres.

Who is building it?

The applicant is National Highway Authority of India.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Dharot (51), Solan, Himachal Pradesh.

How big is it?

It has a stated cost of ₹170.4 crore; a site of 20.3 acres and 11.8 acres (4.8 ha) of forest land.

When was it filed?

The application was filed on 10 Sept 2026.

Project details

Official titleProposal for Diversion of 4.7644 Ha. Additional Forest Land Requirement for Four Laning of NH-05 From Kaithlighat Village to Shakral Section (Shimla Bypass Package I From Km 128.835 to Km 146.300 for Design Length – 17.465 Km) in Already Approved Alignment in the Entire Section From Kaithlighat to Dhalli.
StatusInitial checks
Status since10 Sept 2026
Application filed10 Sept 2026
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantNational Highway Authority of India
Land area20.3 acres (8.2 ha)
Forest land11.8 acres (4.8 ha)
Project cost₹170.4 crore
Village / localityDharot (51)
Taluk / tehsilSolan
DistrictSolan
StateHimachal Pradesh
Location fromSite boundary on record
Our referenceWID-HP-01447

In context

37 applications in Solan since January 2022 are in the same category (Roads & highways): 1 approved, 6 filed or under review, and 30 withdrawn, lapsed or rejected. At 20.3 acres, this one is larger than 55% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dharot (51), Solan, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from National Highway Authority of India in Solan

4 National Highways Authority of India (NHAI) projects in Solan
All 548 National Highways Authority of India (NHAI) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.