Quick answers
What is this project?
Construction of Playground in Muhal Hataun Tehsil Sadar, in Favour of Block Development Officer, Development Block Sadar, District Mandi (H.P.) is a lapsed building project in D.P.F.Saroa (7), Chachyot, Mandi, Himachal Pradesh. The site covers 8.2 acres.
Who is building it?
The applicant is Rural Development Department.
Has it been approved?
No. The application was lapsed on 25 Jan 2024, so it is no longer under consideration.
Where is it?
In D.P.F.Saroa (7), Chachyot, Mandi, Himachal Pradesh.
How big is it?
It has a stated cost of ₹10 lakh; a site of 8.2 acres and 1.7 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 16 Sept 2022.
Project details
| Status | Lapsed |
|---|---|
| Status since | 25 Jan 2024 |
| Application filed | 16 Sept 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Rural Development Department |
| Land area | 8.2 acres (3.3 ha) |
| Forest land | 1.7 acres (0.7 ha) |
| Project cost | ₹10 lakh |
| Village / locality | D.P.F.Saroa (7) |
| Taluk / tehsil | Chachyot |
| District | Mandi |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-01485 |
In context
71 applications in Mandi since January 2022 are in the same category (Buildings & townships): 1 approved, 5 filed or under review, and 65 withdrawn, lapsed or rejected. At 8.2 acres, this one is larger than 93% of them.
37 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
D.P.F.Saroa (7), Chachyot, Mandi, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Parking and way site amenities at lower Terminal Point of Ropeway from Pandoh… — under forest review, 750 m away
- Regularization of Already Constructed of Road Deod to Hataun Km 0/00 to 2/945… — lapsed, 900 m away
- C/o Jal Shakti Micro Hydel Electric Project 0.10 MW — lapsed, 1.3 km away
- Musadi Khuhan Bah to Tawaraphi Road Kms. 0/00 to 5/000 — lapsed, 3 km away
- Regularization of Already Constructed of Road Dhamu to Deori Km 0/00 to 3/200… — lapsed, 3.5 km away
- C/O Bari Dhanyari road km 0/00 to 5/500 — lapsed, 3.7 km away
- C/O Pandoh to Sayog Road Km 0/00 to 4/000 — lapsed, 3.7 km away
- C/O Kipper Kuther Chmbi road km 0/00 to 5/500 — lapsed, 3.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.