Quick answers
What is this project?
Parking and way site amenities at lower Terminal Point of Ropeway from Pandoh to Mata Baglamukhi Temple in Mohal Hataun Distt. Mandi H.P is a proposed project in Hataun (440), Mandi, Himachal Pradesh. The site covers 0.4 acres.
Who is building it?
The applicant is Ropeways and Rapid Transport System Development Corporation H.P. Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Hataun (440), Mandi, Himachal Pradesh.
How big is it?
It has a stated cost of ₹53.9 crore; a site of 0.4 acres and 1,740 m² of forest land.
When was it filed?
The application was filed on 23 Dec 2025.
Project details
| Official title | Development of Parking and way site amenities at lower Terminal Point of Ropeway from Pandoh to Mata Baglamukhi Temple in Mohal Hataun Distt. Mandi H.P. |
|---|---|
| Status | Under forest review |
| Status since | 16 Nov 2026 |
| Application filed | 23 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Ropeways and Rapid Transport System Development Corporation H.P. Limited |
| Land area | 1,700 m² |
| Forest land | 1,740 m² |
| Project cost | ₹53.9 crore |
| Village / locality | Hataun (440) |
| Taluk / tehsil | Mandi |
| District | Mandi |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-02219 |
In context
17 applications in Mandi since January 2022 are in the same category (Other): 1 approved, 6 filed or under review, and 10 withdrawn, lapsed or rejected. At 0.4 acres, this one is smaller than 94% of them.
33 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hataun (440), Mandi, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Playground in Muhal Hataun Tehsil Sadar, in Favour of Block… — lapsed, 750 m away
- Regularization of Already Constructed of Road Deod to Hataun Km 0/00 to 2/945… — lapsed, 1.4 km away
- C/o Jal Shakti Micro Hydel Electric Project 0.10 MW — lapsed, 1.8 km away
- Musadi Khuhan Bah to Tawaraphi Road Kms. 0/00 to 5/000 — lapsed, 2.5 km away
- Multi Village Lift Irrigation Scheme for Part of Seraj Constituency, Tehsil… — lapsed, 3 km away
- Long Firing Range at Sarandha in favour of commandant 3rd India Reserve… — lapsed, 3.3 km away
- Extraction of stone from Khasra No's 637/1 & 636/1, measuring an area 06-18-12… — under environmental review, 4.1 km away
- C/O Bari Dhanyari road km 0/00 to 5/500 — lapsed, 4.1 km away
All 6 Ropeways and Rapid Transport System Development Corporation H.P projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.