What is Developing? Open the mapMap

Not approvedWater & irrigation · Kullu, Himachal Pradesh

Chhaki Nala SHEP (2.5 MW)

Chhaki Nala SHEP (2.5 MW) is a rejected water and irrigation project in Up Muhal Mashda, Kullu, Himachal Pradesh. The site covers 2.2 acres. Its stated project cost is ₹23.4 crore. As of 27 Nov 2026, its status is “Not approved” (since 31 Oct 2024).

See it on the live map All projects in Kullu

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusNot approved
Status since31 Oct 2024
Application filed2 Oct 2024
Approval soughtForest land use
Application typeNew project
SectorWater & irrigation
ApplicantMashara Hydro Power Project Private Limited
Land area2.2 acres (0.9 ha)
Forest land3,110 m²
Project cost₹23.4 crore
Village / localityUp Muhal Mashda
Taluk / tehsilKullu
DistrictKullu
StateHimachal Pradesh
Location fromSite boundary on record
Our referenceWID-HP-02170

In context

28 applications in Kullu since January 2022 are in the same category (Water & irrigation): 0 approved, 9 filed or under review, and 19 withdrawn, lapsed or rejected. At 2.2 acres, this one is smaller than 67% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Up Muhal Mashda, Kullu, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Mashara Hydro Power Project Private Limited in Kullu

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.