Quick answers
What is this project?
C/O Link Road from H.B. Jhirian Katali Lakhala to Sidh Baba Balak Nath Temple in G.P. Lakhala Km 0/00 to 1/500 under HPPWD Sub-Division Swarghat Distt. Bilaspur H.P is a lapsed road project in Abhipur (2), Nalagarh, Solan, Himachal Pradesh. It seeks 2.2 acres of forest land.
Who is building it?
The applicant is Himachal Pradesh Public Work Department.
Has it been approved?
No. The application was lapsed on 5 Apr 2025, so it is no longer under consideration.
Where is it?
In Abhipur (2), Nalagarh, Solan, Himachal Pradesh.
How big is it?
It has a stated cost of ₹54 lakh and 2.2 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 7 Jan 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 5 Apr 2025 |
| Application filed | 7 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Himachal Pradesh Public Work Department |
| Forest land | 2.2 acres (0.9 ha) |
| Project cost | ₹54 lakh |
| Village / locality | Abhipur (2) |
| Taluk / tehsil | Nalagarh |
| District | Solan |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-02309 |
In context
37 applications in Solan since January 2022 are in the same category (Roads & highways): 1 approved, 6 filed or under review, and 30 withdrawn, lapsed or rejected.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Abhipur (2), Nalagarh, Solan, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- C/O Link Road from Gara Mora to Moru via Gara Km 0/00 to 5/00 under HPPWD… — lapsed, 0 m away
- Expansion in Cement production capacity of Existing Stand-alone Grinding Unit… — initial checks, 1.9 km away
- Two Lane Single Tube Tunnel (Tunnel-3 from Km 23+400 to Km 24+425) in Kiratpur… — more information requested, 2.3 km away
- Extraction of Minor Minerals Stone at Khasra no. 79/2 & 80, Measuring 12-18… — environmental approval granted, 4.8 km away
- Mining of Sand, Stone & Bajri from Luhand Khad Proposed by Sh. Amarjit Singh… — more information requested, 4.8 km away
- Mining of Sand, Stone & Bajri from Luhand Khad Proposed by Sh. Amarjit Singh… — cleared for impact study, 4.8 km away
- Terrace Deposits Mining for extraction of Sand, Stone and Bajri proposed by… — environmental approval granted, 5.7 km away
- Hill Slope Mining for Extraction of Stone over 14 Bighas by Sh. Anchit Thakur,… — under environmental review, 5.9 km away
More from Himachal Pradesh Public Work Department in Solan
- Link Road From Shardighat to Ghmbrolla Pull Via Chayavni Via Parwat Raj Mandir… — initial checks
- C/O link road from Jabli to Rajpuri from km 0/0 to 2/250, Tehsil Kasauli,… — lapsed
- C/O link road from Rajpuri to Jabli from km 0/0 to 2/250, Tehsil Kasauli,… — lapsed
- Linnk road Himmatpur Dabli Basoloo Dharampur Road km 0/000 to 6/115 — lapsed
- Link road Himmatpur Dabli to Basoloo Dharampur Km 0/000 to 6/115 — lapsed
- Link road From Shihardi Chamara to Bhede ka Khech (GP Anji Matla) Km 0/000 to… — lapsed
24 Himachal Pradesh Public Work Department projects in Solan
All 784 Himachal Pradesh Public Work Department projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.