| Status | Forest land use approved |
|---|---|
| Status since | 21 Apr 2026 |
| Application filed | 14 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Sjvn Limited |
| Use | Other |
| Land area | 4.3 acres (1.7 ha) |
| Forest land | 4.3 acres (1.7 ha) |
| Plot area | 17,289 m² (1,86,097 sq ft) |
| Project cost | ₹5.5 crore |
| Village / locality | Narola (178/2) |
| Taluk / tehsil | Nankhari |
| District | Shimla |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-02336 |
In context
81 applications in Shimla since January 2022 are in the same category (Buildings & townships): 6 approved, 7 filed or under review, and 68 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 4.3 acres, this one is larger than 81% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Narola (178/2), Nankhari, Shimla, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Extraction of Sand, Stone & Bajri from Khasra No. 2643, 2642, 2641/2, 2635/1,… — environmental approval granted, 1.2 km away
- Extraction of Sand Stone & Bajri for to be established stone crusher unit… — environmental approval granted, 1.5 km away
- Extraction of Sand Stone & Bajri for open sale falling in Mauza/Mohal Neethar,… — environmental approval granted, 1.6 km away
- Sand, Bajri & Stone, Area Measuring 4.67 Hectares Falling in Mauza Neether,… — initial checks, 1.7 km away
- Construction of Road from Nagadhar to Delath. — lapsed, 2 km away
- Extraction of Sand, Stone & Bajri from Khasra No. 2324, 2325, 2332, 2328,… — environmental approval granted, 2.1 km away
- Extraction of sand, stone & bajri for open sale falling in Mauza/Mohal Nithar,… — environmental approval granted, 2.4 km away
- Extraction of Sand, Stone & Bajri from Khasra No. 2479, measuring an area… — environmental approval granted, 2.6 km away
More from Sjvn Limited in Shimla
- Sand, Bajri & Stone, Area Measuring 4.67 Hectares Falling in Mauza Neether,… — initial checks
- Luhri Hydro-Electric Project - I — under environmental review
- Project Name: Change of Land Use for Placement of Crusher Unit for 0.50 Ha.… — forest land use approved
- 220 kV D/c single zebra transmission line from switchyard of 210 MW Luhri… — in-principle approval, conditions pending
5 Sjvn projects in Shimla