Quick answers
What is this project?
Expansion of Grain based Distillery from 85 KLPD to 285 KLPD and Co-generation Power Plant from 1.5 to 9 MW by new installation of 200 KLPD Grain based Ethanol Plant at Plot no. 1 & 1A,Industrial area, Phase III, Sansarpur Terrace, Tehsil Jaswan, District Kangra, Himachal Pradesh by M/s. Premier Alcobev Pvt. Ltd is a proposed power project in Sansar Pur (1), Jaswan, Kangra, Himachal Pradesh. The site covers 11 acres.
Who is building it?
The applicant is Premier Alcobev PVT. LTD..
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Sansar Pur (1), Jaswan, Kangra, Himachal Pradesh.
How big is it?
It has a stated cost of ₹255 crore and a site of 11 acres.
When was it filed?
The application was filed on 12 Oct 2022.
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 12 Oct 2022 |
| Application filed | 12 Oct 2022 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Power |
| Applicant | Premier Alcobev PVT. LTD. |
| Land area | 11 acres (4.5 ha) |
| Project cost | ₹255 crore |
| Village / locality | Sansar Pur (1) |
| Taluk / tehsil | Jaswan |
| District | Kangra |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-02549 |
In context
6 applications in Kangra since January 2022 are in the same category (Power): 1 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sansar Pur (1), Jaswan, Kangra, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Regarding Name Change of Company in Environment clearance letter issued by… — environmental approval granted, 0 m away
- Expansion in the Existing Secondary Metallurgical Unit for Increase in the… — under wildlife review, 200 m away
- Expansion in the Existing Secondary Metallurgical Unit for Increase in the… — more information requested, 200 m away
- Expansion in the Existing Secondary Metallurgical Unit for Increase in the… — environmental approval granted, 200 m away
- Industrial project by M/s Goyal Furnace Private Limited — lapsed, 250 m away
- Project by M/s Goyal Furnace Private Limited — more information requested, 250 m away
- Industrial project by M/s Goyal Furnace Private Limited — cleared for impact study, 250 m away
- Proposed Active Pharmaceutical Ingredient (API) & Intermediates Manufacturing… — under wildlife review, 950 m away
About this information