What is this project?
Expansion in the Existing Secondary Metallurgical Unit for Increase in the Production of Ms Ingots From 19,200 Tpa to 96,600 Tpa by Installation of an Additional Induction Furnace Having Capacity 15 Tph Alongside the Existing Induction Furnace Having Capacity 7 Tph and to Install Continuous Casting Machine Followed by Rolling Mill to Produce 77,280 Tpa of Round /Angle/Channel/Tmt Bars/Flats by M/S Goyal Furnace PVT LTD is a proposed project in Dadoa (35), Jaswan, Kangra, Himachal Pradesh. The site covers 4.4 acres.
Who is building it?
The applicant is Goyal Furnace Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Dadoa (35), Jaswan, Kangra, Himachal Pradesh.
How big is it?
It has a stated cost of ₹48.9 crore and a site of 4.4 acres.
When was it filed?
The application was filed on 2 May 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 2 May 2025 |
| Application filed | 2 May 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Goyal Furnace Private Limited |
| Land area | 4.4 acres (1.8 ha) |
| Project cost | ₹48.9 crore |
| Village / locality | Dadoa (35) |
| Taluk / tehsil | Jaswan |
| District | Kangra |
| State | Himachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-HP-02573 |
In context
10 applications in Kangra since January 2022 are in the same category (Other): 2 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. At 4.4 acres, this one is smaller than 70% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dadoa (35), Jaswan, Kangra, Himachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in the Existing Secondary Metallurgical Unit for Increase in the… — under wildlife review, 0 m away
- Expansion in the Existing Secondary Metallurgical Unit for Increase in the… — environmental approval granted, 0 m away
- Industrial project by M/s Goyal Furnace Private Limited — lapsed, 50 m away
- Project by M/s Goyal Furnace Private Limited — more information requested, 50 m away
- Industrial project by M/s Goyal Furnace Private Limited — cleared for impact study, 50 m away
- Regarding Name Change of Company in Environment clearance letter issued by… — environmental approval granted, 200 m away
- Expansion of Grain based Distillery from 85 KLPD to 285 KLPD and Co-generation… — under wildlife review, 200 m away
- Extraction of sand, stone & bajri from Khasra No. 145/1, measuring an area… — under environmental review, 850 m away
More from Goyal Furnace Private Limited in Kangra
- Expansion in the Existing Secondary Metallurgical Unit for Increase in the… — under wildlife review
- Expansion in the Existing Secondary Metallurgical Unit for Increase in the… — environmental approval granted
- Industrial project by M/s Goyal Furnace Private Limited — lapsed
- Project by M/s Goyal Furnace Private Limited — more information requested
- Industrial project by M/s Goyal Furnace Private Limited — cleared for impact study
All 6 Goyal Furnace projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.