Project details
| Status | Under environmental review |
|---|---|
| Status since | 5 Feb 2023 |
| Application filed | 5 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Department of Civil Aviation, Haryana |
| Land area | 1,605 acres (649.5 ha) |
| Project cost | ₹1,800 crore |
| Village / locality | Bar Hisar |
| Taluk / tehsil | Hisar |
| District | Hisar |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00160 |
In context
53 applications in Hisar since January 2022 are in the same category (Buildings & townships): 14 approved, 17 filed or under review, and 22 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 1,605 acres, this one is larger than 98% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bar Hisar, Hisar, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Expansion of the existing industrial area from 378.69 Ha to 649.52 Ha and… — lapsed, 0 m away
- "Expansion of the existing industrial area from 378.69 Ha to 649.52 Ha and… — cleared for impact study, 0 m away
- "Expansion of Hisar Integrated Manufacturing Cluster (Hisar IMC) from 378.69… — returned to applicant, 0 m away
- Shifting of 132KVA DC IA Hisar 220KV Beer and 132 KV and 132 KV Beer To Arya… — forest land use approved, 1.2 km away
- "Hisar Integrated Manufacturing Cluster (Hisar IMC)" — environmental approval granted, 1.2 km away
- "Hisar Integrated Manufacturing Cluster (Hisar IMC)" — cleared for impact study, 1.2 km away
- Laying of Underground OFC Cable by Bharti Airtel Limited & Tata Teleservices… — forest land use approved, 1.7 km away
- Building project by M/s Supreme Mobiles Private Limited of Sh Sanjay Gupta… — lapsed, 1.8 km away
More from Department of Civil Aviation, Haryana in Hisar
- "Expansion of the existing industrial area from 378.69 Ha to 649.52 Ha and… — lapsed
- "Expansion of the existing industrial area from 378.69 Ha to 649.52 Ha and… — cleared for impact study
- "Expansion of Hisar Integrated Manufacturing Cluster (Hisar IMC) from 378.69… — returned to applicant
All 4 Department of Civil Aviation, Haryana projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.