Project details
| Official title | "Hisar Integrated Manufacturing Cluster (Hisar IMC)" at District-Hisar, Haryana by Department of Civil Aviation, Haryana (DoCA) |
|---|---|
| Status | Environmental approval granted |
| Status since | 20 Dec 2024 |
| Application filed | 24 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Adviser Civil Aviation Haryana |
| Use | Industrial |
| Units | 375 |
| Floors (tallest) | 15 |
| Height | 45 m |
| Land area | 935.8 acres (378.7 ha) |
| Built-up area | 88,33,600 m² (9,50,83,987 sq ft) |
| Plot area | 37,86,900 m² (4,07,61,813 sq ft) |
| Project cost | ₹800 crore |
| Village / locality | Bar Hisar |
| Taluk / tehsil | Hisar |
| District | Hisar |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00562 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Apr 2024 (this page) | Environmental approval granted | 935.8 acres | ₹800 crore |
| Early planning filed 18 Jan 2024 | Cleared for impact study | 935.8 acres | ₹800 crore |
In context
53 applications in Hisar since January 2022 are in the same category (Buildings & townships): 14 approved, 17 filed or under review, and 22 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 935.8 acres, this one is larger than 94% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bar Hisar, Hisar, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Hisar Integrated Manufacturing Cluster (Hisar IMC)" — cleared for impact study, 0 m away
- "Hisar Integrated Manufacturing Cluster" — under environmental review, 1.2 km away
- "Expansion of the existing industrial area from 378.69 Ha to 649.52 Ha and… — lapsed, 1.2 km away
- "Expansion of the existing industrial area from 378.69 Ha to 649.52 Ha and… — cleared for impact study, 1.2 km away
- "Expansion of Hisar Integrated Manufacturing Cluster (Hisar IMC) from 378.69… — returned to applicant, 1.2 km away
- Building project by M/s Supreme Mobiles Private Limited of Sh Sanjay Gupta… — lapsed, 1.5 km away
- r Shifting of Rana Distributary from RD 74500 to 94641 to Provide Alternate… — lapsed, 1.9 km away
- Rana Minnor Shifting — lapsed, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.