Quick answers
What is this project?
Expansion of capacity of Boulder,Gravel and Sand Mining Project "Shamtoo-1 Block/PKL B-11" is a proposed mining project in Ratewali, Panchkula, Haryana. The site covers 114.9 acres.
Who is building it?
The applicant is Starex Minerals.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 11 Aug 2023), as of 27 Nov 2026.
Where is it?
In Ratewali, Panchkula, Haryana.
How big is it?
It has a stated cost of ₹21 crore and a site of 114.9 acres.
When was it filed?
The application was filed on 11 Aug 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of capacity of Boulder,Gravel and Sand Mining Project "Shamtoo-1 Block/PKL B-11"
Project details
| Official title | Expansion of capacity of Boulder,Gravel and Sand Mining Project "Shamtoo-1 Block/PKL B-11" located at village Shamtoo & Rattewali, District Panchkula. |
|---|---|
| Status | Cleared for impact study |
| Status since | 11 Aug 2023 |
| Application filed | 11 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Starex Minerals |
| Land area | 114.9 acres (46.5 ha) |
| Project cost | ₹21 crore |
| Village / locality | Ratewali |
| Taluk / tehsil | Panchkula |
| District | Panchkula |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00197 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 22 Jan 2025 | Environmental approval granted | 114.9 acres | ₹21 crore |
| Early planning filed 11 Aug 2023 (this page) | Cleared for impact study | 114.9 acres | ₹21 crore |
In context
20 applications in Panchkula since January 2022 are in the same category (Mining): 15 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 114.9 acres, this one is larger than 90% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Ratewali, Panchkula, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of capacity of Boulder,Gravel and Sand Mining Project "Shamtoo-1… — environmental approval granted, 0 m away
- Mining for STAREX MINERALS at Khasra No. - 55 — forest land use approved, 350 m away
- Widening and strengthening of Rattewali-Tibbi-Sabilpur Road from RD 3250 to… — more information requested, 1.1 km away
- Diversion of Forest Land for Access to Approach Road From the Proposed Site… — forest land use approved, 1.3 km away
- Expansion of River Bed Mining Project at Shamtoo- 2 Block/PKL B-12 — environmental approval granted, 1.3 km away
- Expansion of River Bed Mining Project at Shamtoo- 2 Block/PKL B-12 — environmental approval granted, 1.3 km away
- River Bed Mining of Gravel and Sand: Shamtoo-2: Block/PKL B-12 — environmental approval granted, 1.3 km away
- Expansion of River Bed Mining Project at Shamtoo- 2 Block/PKL B-12 — more information requested, 1.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.