Quick answers
What is this project?
Expansion of River Bed Mining Project at Shamtoo- 2 Block/PKL B-12 is an approved mining project in Syamtu, Panchkula, Haryana. The site covers 111.2 acres.
Who is building it?
The applicant is Ganesh Enterprises.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Sept 2024), as of 27 Nov 2026.
Where is it?
In Syamtu, Panchkula, Haryana.
How big is it?
It has a stated cost of ₹11.6 crore and a site of 111.2 acres.
When was it filed?
The application was filed on 30 May 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Expansion of River Bed Mining Project at Shamtoo- 2 Block/PKL B-12
Project details
| Official title | Expansion of River Bed Mining Project at Shamtoo- 2 Block/PKL B-12 at Village Shamtoo,District Panchkula,Haryana. Capacity Increase from 3.87 LTPA to 11.60 LTPA over an area of 45.00 ha |
|---|---|
| Status | Environmental approval granted |
| Status since | 26 Sept 2024 |
| Application filed | 30 May 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | Ganesh Enterprises |
| Land area | 111.2 acres (45 ha) |
| Project cost | ₹11.6 crore |
| Village / locality | Syamtu |
| Taluk / tehsil | Panchkula |
| District | Panchkula |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00647 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 1 Apr 2026 | Environmental approval granted | 111.2 acres | ₹11.6 crore |
| Expansion filed 30 May 2024 (this page) | Environmental approval granted | 111.2 acres | ₹11.6 crore |
| Early planning filed 16 Jul 2023 | More information requested | 111.2 acres | ₹11.6 crore |
In context
20 applications in Panchkula since January 2022 are in the same category (Mining): 15 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 111.2 acres, this one is larger than 65% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Syamtu, Panchkula, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of River Bed Mining Project at Shamtoo- 2 Block/PKL B-12 — environmental approval granted, 0 m away
- River Bed Mining of Gravel and Sand: Shamtoo-2: Block/PKL B-12 — environmental approval granted, 0 m away
- Expansion of River Bed Mining Project at Shamtoo- 2 Block/PKL B-12 — more information requested, 0 m away
- Diversion of Forest Land for Access to Approach Road From the Proposed Site… — forest land use approved, 50 m away
- River Bed Mining of Gravel and Sand: Shamtoo-2: Block/PKL B-12 — environmental approval granted, 600 m away
- Mining for STAREX MINERALS at Khasra No. - 55 — forest land use approved, 1 km away
- Expansion of capacity of Boulder,Gravel and Sand Mining Project "Shamtoo-1… — environmental approval granted, 1.3 km away
- Expansion of capacity of Boulder,Gravel and Sand Mining Project "Shamtoo-1… — cleared for impact study, 1.3 km away
More from Ganesh Enterprises in Panchkula
- River Bed Mining of Gravel and Sand: Shamtoo-2: Block/PKL B-12 — environmental approval granted
- Diversion of Forest Land for Access to Approach Road From the Proposed Site… — forest land use approved
- River Bed Mining of Gravel and Sand: Shamtoo-2: Block/PKL B-12 — environmental approval granted
All 6 Ganesh Enterprises projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.