What is Developing? Open the mapMap

Cleared for impact studyBuildings & townships · Sonipat, Haryana

Proposed expansion of Industrial shed for Automobile Manufacturing (Integrated facilities) Unit situated at Plot No. 831, Industrial Model Township (IMT) Kharkhoda, Sonipat, Haryana, Pincode-131402

Proposed expansion of Industrial shed for Automobile Manufacturing (Integrated facilities) Unit situated at Plot No. 831, Industrial Model Township (IMT) Kharkhoda, Sonipat, Haryana, Pincode-131402 is a proposed building project in Sohti, Kharkhoda, Sonipat, Haryana. The site covers 726.7 acres. Its stated project cost is ₹37,659.6 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 21 Aug 2023).

See it on the live map All projects in Sonipat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed expansion of Industrial shed for Automobile Manufacturing (Integrated facilities) Unit situated at Plot No. 831, Industrial Model Township (IMT) Kharkhoda, Sonipat, Haryana, Pincode-131402 is a proposed building project in Sohti, Kharkhoda, Sonipat, Haryana. The site covers 726.7 acres.

Who is building it?

The applicant is Maruti Suzuki India Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 21 Aug 2023), as of 27 Nov 2026.

Where is it?

In Sohti, Kharkhoda, Sonipat, Haryana.

How big is it?

It has a stated cost of ₹37,659.6 crore and a site of 726.7 acres.

When was it filed?

The application was filed on 21 Aug 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed expansion of Industrial shed for Automobile Manufacturing (Integrated…

Project details

StatusCleared for impact study
Status since21 Aug 2023
Application filed21 Aug 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantMaruti Suzuki India Limited
Land area726.7 acres (294.1 ha)
Project cost₹37,659.6 crore
Village / localitySohti
Taluk / tehsilKharkhoda
DistrictSonipat
StateHaryana
Location fromSite area on record
Our referenceWID-HR-00232

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 29 Jan 2024Environmental approval granted726.7 acres₹37,659.6 crore
Early planning filed 21 Aug 2023 (this page)Cleared for impact study726.7 acres₹37,659.6 crore

In context

95 applications in Sonipat since January 2022 are in the same category (Buildings & townships): 26 approved, 13 filed or under review, and 56 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 726.7 acres, this one is larger than 98% of them.

21 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sohti, Kharkhoda, Sonipat, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 11 Maruti Suzuki India projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.