What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Sonipat, Haryana

Proposed expansion of Industrial shed for Automobile Manufacturing (Integrated facilities) Unit situated at Plot No. 831, Industrial Model Township (IMT) Kharkhoda, Sonipat, Haryana, Pincode-131402

Proposed expansion of Industrial shed for Automobile Manufacturing (Integrated facilities) Unit situated at Plot No. 831, Industrial Model Township (IMT) Kharkhoda, Sonipat, Haryana, Pincode-131402 is an approved industrial building project in Sohti, Kharkhoda, Sonipat, Haryana. It plans 3,101 units of up to 3 floors on 726.7 acres. Its stated project cost is ₹37,659.6 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 28 May 2024).

See it on the live map All projects in Sonipat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed expansion of Industrial shed for Automobile Manufacturing (Integrated facilities) Unit situated at Plot No. 831, Industrial Model Township (IMT) Kharkhoda, Sonipat, Haryana, Pincode-131402 is an approved industrial building project in Sohti, Kharkhoda, Sonipat, Haryana. It plans 3,101 units of up to 3 floors on 726.7 acres.

Who is building it?

The applicant is Maruti Suzuki India Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 28 May 2024), as of 27 Nov 2026.

Where is it?

In Sohti, Kharkhoda, Sonipat, Haryana.

How big is it?

It has a stated cost of ₹37,659.6 crore and a site of 726.7 acres.

When was it filed?

The application was filed on 29 Jan 2024.

Project details

StatusEnvironmental approval granted
Status since28 May 2024
Application filed29 Jan 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantMaruti Suzuki India Limited
UseIndustrial
Units3,101
Floors (tallest)3
Land area726.7 acres (294.1 ha)
Built-up area10,61,046 m² (1,14,20,993 sq ft)
Plot area29,40,663 m² (3,16,53,002 sq ft)
Project cost₹37,659.6 crore
Village / localitySohti
Taluk / tehsilKharkhoda
DistrictSonipat
StateHaryana
Location fromSite boundary on record
Our referenceWID-HR-00652

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 29 Jan 2024 (this page)Environmental approval granted726.7 acres₹37,659.6 crore
Early planning filed 21 Aug 2023Cleared for impact study726.7 acres₹37,659.6 crore

In context

95 applications in Sonipat since January 2022 are in the same category (Buildings & townships): 26 approved, 13 filed or under review, and 56 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 726.7 acres, this one is larger than 98% of them.

21 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sohti, Kharkhoda, Sonipat, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 11 Maruti Suzuki India projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.