Quick answers
What is this project?
Expansion of Manufacturing Capacity of Avtar Steel Limited Unit – B, Village - Jat Joshi, District - Sonipat, Haryana from 29000 MTPA to 80000 MTPA is an approved industrial project in Joshi Jat, Sonipat, Haryana. The site covers 4.7 acres.
Who is building it?
The applicant is Avtar Steel Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Sept 2024), as of 27 Nov 2026.
Where is it?
In Joshi Jat, Sonipat, Haryana.
How big is it?
It has a stated cost of ₹39 crore and a site of 4.7 acres.
When was it filed?
The application was filed on 27 Jan 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Sept 2024 |
| Application filed | 27 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Avtar Steel Limited |
| Land area | 4.7 acres (1.9 ha) |
| Project cost | ₹39 crore |
| Village / locality | Joshi Jat |
| Taluk / tehsil | Sonipat |
| District | Sonipat |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00575 |
In context
50 applications in Sonipat since January 2022 are in the same category (Industry): 14 approved, 7 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.7 acres, this one is larger than 72% of them.
51 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Joshi Jat, Sonipat, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s Lohia Alloys Ltd. at 41-2/5, Village-Joshi Chauhan… — more information requested, 950 m away
- Expansion of Manufacturing Capacity of Avtar Steel Limited Unit – IV, Village-… — lapsed, 1 km away
- Retail Outlet of M/S Reliance Bp Mobility LTD. on Odr Road (Bahalgarh to… — forest land use approved, 1.1 km away
- Access to approach road to the proposed site of M/s AD RealTech LLP at KM… — lapsed, 1.1 km away
- Access to approach road to the proposed site of M/s AB RealTech LLP at KM… — lapsed, 1.1 km away
- Retail Outlet (Petrol Pump) at Sultanpur — forest land use approved, 1.4 km away
- "M/s DEVGIRI ESTATES PVT. LTD." ON STATE HIGHWAY FROM BAHALGARH TO SONIPAT… — lapsed, 1.7 km away
- Diversion of forest land for approach access to Proposed Site of private… — forest land use approved, 1.7 km away
More from Avtar Steel Limited in Sonipat
- Ss/ Alloy Steel/ Carbon Steel- Ingots/ Billets and Flanges Manufacturing… — under environmental review
- Expansion of Manufacturing Capacity of Avtar Steel Limited Unit – IV, Village-… — lapsed
- Expansion of Manufacturing Capacity of Avtar Steel Limited Unit – IV, Village-… — cleared for impact study
All 4 Avtar Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.