Quick answers
What is this project?
Proposed Melamine & Urea Formaldehyde Resins & Molding Compound manufacturing unit with production capacity of 30 MT/day coming up at Khasra No 53//13/1/1, 13/1/2, 13/2/1, 13/2/2, 18/1/1/1/1, 18/1/1/2/1, 18/1/2/1, Village Dhaturi, Sonipat, Haryana-131039 promoted by M/s Golden Sun Agro Foods Pvt. Ltd.(Unit-2) is a proposed industrial project in Mamarpur, Sonipat, Haryana. The site covers 1.2 acres.
Who is building it?
The applicant is Golden Sun Agro Foods Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 25 Nov 2024), as of 27 Nov 2026.
Where is it?
In Mamarpur, Sonipat, Haryana.
How big is it?
It has a stated cost of ₹8.2 crore and a site of 1.2 acres.
When was it filed?
The application was filed on 8 Nov 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Melamine & Urea Formaldehyde Resins & Molding Compound manufacturing unit with…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 25 Nov 2024 |
| Application filed | 8 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Golden Sun Agro Foods Private Limited |
| Land area | 1.2 acres (0.5 ha) |
| Project cost | ₹8.2 crore |
| Village / locality | Mamarpur |
| Taluk / tehsil | Sonipat |
| District | Sonipat |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00636 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Aug 2025 | Environmental approval granted | 1.2 acres | ₹8.2 crore |
| Early planning filed 8 Nov 2024 (this page) | Cleared for impact study | 1.2 acres | ₹8.2 crore |
In context
50 applications in Sonipat since January 2022 are in the same category (Industry): 14 approved, 7 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.2 acres, this one is smaller than 78% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mamarpur, Sonipat, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Melamine & Urea Formaldehyde Resins & Molding Compound manufacturing… — environmental approval granted, 0 m away
- Power project by 33 KV Line of M/S Seagull Buildwell (P) Limited — lapsed, 3.4 km away
- Diversion of Forest Land for Approach Access to the Proposed Site of Warehouse… — lapsed, 3.6 km away
- Diversion of Private Land Enclosed Under Plpa Section – 4 for Approach Access… — lapsed, 3.6 km away
- Industrial project by Imperia Industries India Pvt Ltd — lapsed, 3.8 km away
- HPCL CGD Project Sonipat — lapsed, 4.2 km away
- Diversion of 0.64 ha. of Forest Land for NH 44 (Barhi) to Ramnagar Industrial… — lapsed, 4.2 km away
- Diversion of 0.64 Ha. of Forest Land for Transportation of Natural Gas to… — lapsed, 4.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.