Quick answers
What is Industrial project by Imperia Industries India Pvt Ltd?
This lapsed industrial project by Imperia Industries India Pvt Ltd is in Ramnagar, Ganaur, Sonipat, Haryana. The site covers 0.4 acres.
Who is building it?
The applicant is Imperia Industries India PVT LTD.
Has it been approved?
No. The application was lapsed on 30 Oct 2026, so it is no longer under consideration.
Where is it?
In Ramnagar, Ganaur, Sonipat, Haryana.
How big is it?
It has a stated cost of ₹2 crore; a site of 0.4 acres and 20 m² of forest land.
When was it filed?
The application was filed on 14 Sept 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 30 Oct 2026 |
| Application filed | 14 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Industry |
| Applicant | Imperia Industries India PVT LTD |
| Land area | 1,600 m² |
| Forest land | 20 m² |
| Project cost | ₹2 crore |
| Village / locality | Ramnagar |
| Taluk / tehsil | Ganaur |
| District | Sonipat |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-03829 |
In context
50 applications in Sonipat since January 2022 are in the same category (Industry): 14 approved, 7 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.4 acres, this one is smaller than 98% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ramnagar, Ganaur, Sonipat, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land of 0.0050 Ha. for Access to Industrial Unit (Private… — lapsed, 2.6 km away
- Proposed Melamine & Urea Formaldehyde Resins & Molding Compound manufacturing… — environmental approval granted, 3.8 km away
- Proposed Melamine & Urea Formaldehyde Resins & Molding Compound manufacturing… — cleared for impact study, 3.8 km away
- Diversion of Forest Land for approach access to Proposed Site for Setting up… — lapsed, 4.3 km away
- Power project by 33 KV Line of M/S Seagull Buildwell (P) Limited — lapsed, 4.5 km away
- Pharmaceutical & Pesticide Intermediate Project — more information requested, 4.8 km away
- Pharmaceutical & Pesticide Intermediate Project — cleared for impact study, 4.8 km away
- HPCL CGD Project Sonipat — lapsed, 4.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.