Proposed RBM mining project "Raipur Rani-Manak Tabra Mining Unit" by M/s Infinity Mining is a proposed mining project in Manak Tabra, Panchkula, Haryana. The site covers 41.8 acres.
Who is building it?
The applicant is Neeraj Gupta.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 6 Mar 2026), as of 27 Nov 2026.
Where is it?
In Manak Tabra, Panchkula, Haryana.
How big is it?
It has a stated cost of ₹4 crore and a site of 41.8 acres.
When was it filed?
The application was filed on 6 Mar 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 6 Mar 2026 |
| Application filed | 6 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Neeraj Gupta |
| Land area | 41.8 acres (16.9 ha) |
| Project cost | ₹4 crore |
| Village / locality | Manak Tabra |
| Taluk / tehsil | Panchkula |
| District | Panchkula |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-00920 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Aug 2026 | Under environmental review | 41.8 acres | ₹4 crore |
| Early planning filed 6 Mar 2026 (this page) | Cleared for impact study | 41.8 acres | ₹4 crore |
In context
20 applications in Panchkula since January 2022 are in the same category (Mining): 15 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 41.8 acres, this one is smaller than 85% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Manak Tabra, Panchkula, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed RBM mining project "Raipur Rani-Manak Tabra Mining Unit" by M/s… — under environmental review, 0 m away
- Diversion of Forest Land for Proposed Site of Kirti Screening Plant on Raipur… — lapsed, 550 m away
- Diversion of forest Land for approach access to proposed site for setting up… — forest land use approved, 750 m away
- Kirti Screening Plan — lapsed, 800 m away
- Diversion of 0.0094 Hac. of Forest Land for Access to Approach Road From the… — forest land use approved, 900 m away
- Diversion of Forest Land for approach access to Proposed Site of SK TRADERS on… — forest land use approved, 1 km away
- Diversion of Forest Land for access to approach road from the proposed site of… — forest land use approved, 1.3 km away
- Diversion of forest land for Construction of 11KV Electric Line from 66KV Sub… — forest land use approved, 1.4 km away