Quick answers
What is this project?
Proposed RBM mining project "Raipur Rani-Manak Tabra Mining Unit" by M/s Infinity Mining is a proposed mining project in Manak Tabra, Panchkula, Haryana. The site covers 41.8 acres.
Who is building it?
The applicant is Neeraj Gupta.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Manak Tabra, Panchkula, Haryana.
How big is it?
It has a stated cost of ₹4 crore and a site of 41.8 acres.
When was it filed?
The application was filed on 29 Aug 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed RBM mining project "Raipur Rani-Manak Tabra Mining Unit" by M/s Infinity Mining
Project details
| Status | Under environmental review |
|---|---|
| Status since | 14 Nov 2026 |
| Application filed | 29 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Neeraj Gupta |
| Land area | 41.8 acres (16.9 ha) |
| Project cost | ₹4 crore |
| Village / locality | Manak Tabra |
| Taluk / tehsil | Panchkula |
| District | Panchkula |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-01154 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Aug 2026 (this page) | Under environmental review | 41.8 acres | ₹4 crore |
| Early planning filed 6 Mar 2026 | Cleared for impact study | 41.8 acres | ₹4 crore |
In context
20 applications in Panchkula since January 2022 are in the same category (Mining): 15 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 41.8 acres, this one is smaller than 85% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Manak Tabra, Panchkula, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed RBM mining project "Raipur Rani-Manak Tabra Mining Unit" by M/s… — cleared for impact study, 0 m away
- Diversion of Forest Land for Proposed Site of Kirti Screening Plant on Raipur… — lapsed, 550 m away
- Diversion of forest Land for approach access to proposed site for setting up… — forest land use approved, 750 m away
- Kirti Screening Plan — lapsed, 800 m away
- Diversion of 0.0094 Hac. of Forest Land for Access to Approach Road From the… — forest land use approved, 900 m away
- Diversion of Forest Land for approach access to Proposed Site of SK TRADERS on… — forest land use approved, 1 km away
- Diversion of Forest Land for access to approach road from the proposed site of… — forest land use approved, 1.3 km away
- Diversion of forest land for Construction of 11KV Electric Line from 66KV Sub… — forest land use approved, 1.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.