Quick answers
What is Construction of Drain in Limits of Mc Barara Ambala?
Construction of Drain in Limits of Mc Barara Ambala is a lapsed project in Barara, Ambala, Haryana. The site covers 4.7 acres.
Who is building it?
The applicant is Municipal Council Barara.
Has it been approved?
No. The application was lapsed on 19 Jan 2026, so it is no longer under consideration.
Where is it?
In Barara, Ambala, Haryana.
How big is it?
It has a stated cost of ₹97 lakh; a site of 4.7 acres and 2.1 acres (0.8 ha) of forest land.
When was it filed?
The application was filed on 30 Aug 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 19 Jan 2026 |
| Application filed | 30 Aug 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Municipal Council Barara |
| Land area | 4.7 acres (1.9 ha) |
| Forest land | 2.1 acres (0.8 ha) |
| Project cost | ₹97 lakh |
| Village / locality | Barara |
| Taluk / tehsil | Barara |
| District | Ambala |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-01369 |
In context
52 applications in Ambala since January 2022 are in the same category (Other): 3 approved, 12 filed or under review, and 37 withdrawn, lapsed or rejected. At 4.7 acres, this one is larger than 64% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Barara, Ambala, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Drain from Ravidass mandir to Main road in MC limit Barara Ambala — lapsed, 150 m away
- RCC Naala and providing/laying of 80mm thick ISI M-40 IPBs on Berms from… — lapsed, 450 m away
- Drain and Laying Ipbs. M-40 Along Road From Railway Stn to Stp in Mc Barara… — lapsed, 1.3 km away
- Approach road to CHC Barara Distt Ambala — lapsed, 1.4 km away
- Project by Shree Shyam Ji Builders — lapsed, 2.3 km away
- Project by Shree Shyam Ji Builders — lapsed, 2.3 km away
- Poly House for Smt Usha and Mehak Bindal — under forest review, 3 km away
- Proposed expansion of existing Maharishi Markandeshwar (Deemed to be… — cleared for impact study, 3.6 km away
More from Municipal Council Barara in Ambala
- Drain from Ravidass mandir to Main road in MC limit Barara Ambala — lapsed
- RCC Naala and providing/laying of 80mm thick ISI M-40 IPBs on Berms from… — lapsed
- Drain and Laying Ipbs. M-40 Along Road From Railway Stn to Stp in Mc Barara… — lapsed
All 4 Municipal Council Barara projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.